SUBJECT*
FY27 NRM - VISN CSI Base Fluoroscopy Room C216o Prep - 539-CSI-208
GENERAL INFORMATION
CONTRACTING OFFICE’S ZIP CODE*
45219-2356
SOLICITATION NUMBER*
36C25027B0007
RESPONSE DATE/TIME/ZONE
11-20-2026 15:00 EASTERN TIME, NEW YORK, USA
ARCHIVE
90 DAYS AFTER THE RESPONSE DATE
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
Z2DA
NAICS CODE*
236220
PLACE OF PERFORMANCE
POSTAL CODE
COUNTRY
CONTACT INFORMATION
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs
Network Contracting Office 10
260 E University Avenue
Cincinnati OH 45219-2356
POINT OF CONTACT*
Contracting Officer
Patrice Scott
[email protected]
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
CONSTRUCTION STATEMENT OF WORK
Fluoroscopy Room C216o Prep
Project No. 539-CSI-208
Date: July 30, 2026
The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Fluoroscopy Room C216o Prep Project 539-CSI-208, including preparation of site for building operations including demolition and removal of existing structures, and furnish labor and materials and perform work as required by drawings and specifications.
Work includes architectural, mechanical, electrical, plumbing and other trades as shown and specified in project drawings and specifications.
This construction project will address infrastructure upgrades and modifications to support install of a new Fluoroscopy C-Arm within the Cath Lab space at the Cincinnati VAMC as outlined within the construction drawings.
The above construction Statement Of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifictions be initiated to determine the needs and conditions for the construction of this project.
Period of Performance: All phases of work completed within 180 calendar days after issuance of the Notice to Proceed.