Home / FY27 NRM - VISN CSI Base Fluoroscopy Room C216o Prep … / Document

Bid document

Updated

A Word document (18 KB) attached to FY27 NRM - VISN CSI Base Fluoroscopy Room C216o Prep - 539-CSI-208, from the Department of Veterans Affairs. Due Nov 20, 2026, 3:00 PM (UTC-5).

File name: 36C25027B0007.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview



SUBJECT*

FY27 NRM - VISN CSI Base Fluoroscopy Room C216o Prep - 539-CSI-208

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*

45219-2356

SOLICITATION NUMBER*

36C25027B0007

RESPONSE DATE/TIME/ZONE

11-20-2026 15:00 EASTERN TIME, NEW YORK, USA

ARCHIVE

90 DAYS AFTER THE RESPONSE DATE

SET-ASIDE

SDVOSBC

PRODUCT SERVICE CODE*

Z2DA

NAICS CODE*

236220

PLACE OF PERFORMANCE

POSTAL CODE

COUNTRY

CONTACT INFORMATION

CONTRACTING OFFICE ADDRESS

Department of Veterans Affairs
Network Contracting Office 10
260 E University Avenue

Cincinnati OH 45219-2356

POINT OF CONTACT*

Contracting Officer
Patrice Scott
[email protected]

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

CONSTRUCTION STATEMENT OF WORK

Fluoroscopy Room C216o Prep
Project No. 539-CSI-208
Date: July 30, 2026

The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Fluoroscopy Room C216o Prep Project 539-CSI-208, including preparation of site for building operations including demolition and removal of existing structures, and furnish labor and materials and perform work as required by drawings and specifications.

Work includes architectural, mechanical, electrical, plumbing and other trades as shown and specified in project drawings and specifications.

This construction project will address infrastructure upgrades and modifications to support install of a new Fluoroscopy C-Arm within the Cath Lab space at the Cincinnati VAMC as outlined within the construction drawings.

The above construction Statement Of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifictions be initiated to determine the needs and conditions for the construction of this project.

Period of Performance: All phases of work completed within 180 calendar days after issuance of the Notice to Proceed.

The beginning of the document. Download the full file to read on.