Bid document
Updated
A Word document (15 KB) attached to FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206, from the Department of Veterans Affairs. Due Nov 30, 2026, 3:00 PM (UTC-5).
File name: 36C25027B0008.docx
The full file is for paid members, or buy this bid alone.
Preview
SUBJECT*
FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206
GENERAL INFORMATION
CONTRACTING OFFICE’S ZIP CODE*
45219-2356
SOLICITATION NUMBER*
36C25027B0008
RESPONSE DATE/TIME/ZONE
11-30-2026 15:00 EASTERN TIME, NEW YORK, USA
ARCHIVE
90 DAYS AFTER THE RESPONSE DATE
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
Z1DA
NAICS CODE*
236220
PLACE OF PERFORMANCE
POSTAL CODE
COUNTRY
CONTACT INFORMATION
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs
Network Contracting Office 10
260 E University Avenue
Cincinnati OH 45219-2356
POINT OF CONTACT*
Contracting Officer
Patrice Scott
[email protected]
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
CONSTRUCTION STATEMENT OF WORK
Install Roof Equipment Railings
Project No. 539-22-206
The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Install Roof Equipment Railings project, including prepare site for building operations, demolition and removal of existing structures, furnish labor and materials and perform work as required by drawings and specifications. Work includes carpentry and roofing work, and certain other items shown and specified in project drawings and specifications. This construction project will install various rooftop safety railings and work platforms at the Cincinnati VA. This work includes general construction, roofing, abatement, etc. The above construction Statement Of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifiction be initiated to determine the needs and conditions for the construction of this project. Period of Performance: All phases of work completed within 240 calendar days after issuance of the Notice to Proceed.
The beginning of the document. Download the full file to read on.