Home / FY27 NRM - VISN Base Install Roof Equipment Railings … / Document

Bid document

Updated

A Word document (15 KB) attached to FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206, from the Department of Veterans Affairs. Due Nov 30, 2026, 3:00 PM (UTC-5).

File name: 36C25027B0008.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview



SUBJECT*

FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*

45219-2356

SOLICITATION NUMBER*

36C25027B0008

RESPONSE DATE/TIME/ZONE

11-30-2026 15:00 EASTERN TIME, NEW YORK, USA

ARCHIVE

90 DAYS AFTER THE RESPONSE DATE

SET-ASIDE

SDVOSBC

PRODUCT SERVICE CODE*

Z1DA

NAICS CODE*

236220

PLACE OF PERFORMANCE

POSTAL CODE

COUNTRY

CONTACT INFORMATION

CONTRACTING OFFICE ADDRESS

Department of Veterans Affairs
Network Contracting Office 10
260 E University Avenue

Cincinnati OH 45219-2356

POINT OF CONTACT*

Contracting Officer
Patrice Scott
[email protected]

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

CONSTRUCTION STATEMENT OF WORK

Install Roof Equipment Railings
Project No. 539-22-206

The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Install Roof Equipment Railings project, including prepare site for building operations, demolition and removal of existing structures, furnish labor and materials and perform work as required by drawings and specifications. Work includes carpentry and roofing work, and certain other items shown and specified in project drawings and specifications. This construction project will install various rooftop safety railings and work platforms at the Cincinnati VA. This work includes general construction, roofing, abatement, etc. The above construction Statement Of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifiction be initiated to determine the needs and conditions for the construction of this project. Period of Performance: All phases of work completed within 240 calendar days after issuance of the Notice to Proceed.

The beginning of the document. Download the full file to read on.