Home / ***FY27 Requirement*** First Floor X Ray - Room CC157… / Document

Bid document

Updated

A Word document (18 KB) attached to ***FY27 Requirement*** First Floor X Ray - Room CC157 553-CSI-022, from the Department of Veterans Affairs. Due Nov 30, 2026, 3:00 PM (UTC-5).

File name: 36C25027B0005.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview



SUBJECT*

***FY27 Requirement*** First Floor X Ray - Room CC157 553-CSI-022

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*

48105-9484

SOLICITATION NUMBER*

36C25027B0005

RESPONSE DATE/TIME/ZONE

11-30-2026 15:00 EASTERN TIME, NEW YORK, USA

ARCHIVE

60 DAYS AFTER THE RESPONSE DATE

SET-ASIDE

SDVOSBC

PRODUCT SERVICE CODE*

Z1DA

NAICS CODE*

236220

PLACE OF PERFORMANCE

John D. Dingell VA Medical Center

4646 John R St.

Detroit MI

POSTAL CODE

48201

COUNTRY

CONTACT INFORMATION

CONTRACTING OFFICE ADDRESS

Department of Veterans Affairs
Network Contracting Office 10

24 Frank Lloyd Wright Drive

Suite M2200
Ann Arbor MI 48105-9484

POINT OF CONTACT*

Contract Specialist
Angelo D Vivio
[email protected]
734-845-3802

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

This is a Pre-Solicitation announcement to inform potential offerors of the Department of Veterans Affairs intent to advertise an Invitation For Bids (IFB) on Project 553-CSI-022 – First Floor X-Ray – Room CC157 at the VA Medical Center in Detroit, Michigan. An Invitation for Bid (IFB) is planned to be issued on or about December 11, 2026. Contractor shall renovate existing space on the first floor of the John D. Dingell VAMC for an X Ray room, control room, changing space, possible bathroom, and refurbished waiting/check-in space. The area of renovations is approximately 1244 sf. The rooms affected are C1660, CC156, C1695, C1692, C1693, C1694, C1695, C1696, and CC157. These existing rooms are currently changing areas, hallways, waiting spaces, and a bathroom which will require demolition and new work to create the X Ray room and Control room Site Prep. The work will also involve refurbishment to the adjacent waiting room and check-in area which is affected by the new layout. All Electrical, mechanical, and architectural work (lead lined walls, flooring, ceiling) shall be included in the design and construction. Perform all work without disruption to Medical Center operations. Normal administrative hours: 8:00 a.m. - 4:30 p.m. Monday thru Friday (Excluding Federal Holidays). Normal working hours shall be between 7:00 a.m. – 4:30 p.m. Utility shutdowns will be performed outside of normal working hours. Authorization to work other than normal working hours will be requested in advance for evaluation and approval by the COR and Contracting. Period of Performance: 180 days All work performed shall be fully documented by the Contractor. Construction shall be performed in compliance with manufacturer’s recommendations and applicable Codes and VA standards.

The beginning of the document. Download the full file to read on.