Home / Natchez Trace Parkway Project MS NP NATR 3F26 / Document

Categorical Exclusion Form

Updated

A PDF document (359 KB) attached to Natchez Trace Parkway Project MS NP NATR 3F26, from the Federal Highway Administration. Due Nov 3, 2026, 2:00 PM (UTC-5).

File name: Categorical Exclusion Form (NEPA) (FHWA).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Eastern Federal Lands Highway Division
NEPA Categorical Exclusion Form

Project Number:

MS NP NATR 3F26

Project Name:

Natchez Trace Parkway Mainline Overlay from
MP 226.55 to MP 239.23

Location:

National Park Service, Natchez Trace Parkway
Chickasaw County, Mississippi

CE Category

23 CFR 771.117(c)(26): Modernization of a

highway by resurfacing, restoration, rehabilitation,
reconstruction, adding shoulders, or adding
auxiliary lanes (including parking, weaving,
turning, and climbing lanes), if the action meets
the constraints in paragraph (e)[..]

Date: 4/24/2026

See 23 CFR 771.117 for full description of CE categories, including additional requirements when applying (c)26-28.

Project Description
This project consists of resurfacing the Parkway, including ramps, bridges, intersections and parking/pull-off areas. The work includes milling, asphalt overlay, shoulder widening, spot reconstruction, pavement markings, raised profile striping at bridge approaches, and other miscellaneous work.
Environmental Commitments and Mitigation Measures
•

Rare, Threatened & Endangered Species:
o Northern Long-eared Bat (NLEB) and Tri-colored Bat:
 Tree removal will occur between August 1 to December 14 or February 16 to May 14.  Bridge and culvert work, including roadway paving above culverts and riprap placement at inlets/outlets, will occur between August 1 to December 14 or February 16 to May 14.  If bridge or culvert work, including paving above culverts, needs to occur between December 15 and February 15 or May 15 to July 31, a qualified biologist will inspect structures for evidence of bat use prior to construction. • Inspections will follow Appendix K, Assessing and Surveying Bridges and Culverts for Bat Use in the most recent version of the Range-wide Indiana Bat & Northern Long-eared Bat Survey Guidelines (https://www.fws.gov/media/rangewide-indiana-bat-and-northern-long-eared-bat-survey-guidelines). The guidance will be provided to the qualified biologist preforming inspections. • Inspections will occur within two years of construction activities beginning at a structure.
• The Bridge/Culvert Assessment Form from Appendix K will be used to

EFLHD NEPA Categorical Exclusion Form

MS NP NATR 3F26

EFL-TM-ENV-03(04)

Eastern Federal Lands Highway Division
NEPA Categorical Exclusion Form

•

•

document inspections. https://www.fws.gov/sites/default/files/documents/202504/bridge-and-culvert-bat-assessment-form-1.pdf • All culverts 24-inches or greater and 23 feet or greater in length, will be

The beginning of the document. Download the full file to read on.

Other documents in this bid