CHE INDEFINTE DELIVERY/INDEFINITE QUANTITY

STATEMENT OF WORK

01 JULY 2026

1. SCOPE OF WORK

a. Requirements of this contract include the furnishing of all labor, materials, supplies, equipment, management and supervision to perform the designated work at the Federal Law Enforcement Training Center, Cheltenham, MD. The work shall include all changes and repairs indicated thereto, as set forth in the individual task orders. This section and the referenced Technical Specifications for Divisions 1-48 will be a part of any ensuing task order as applicable.
b. All design documentation and construction accomplished pursuant to this contract shall comply with the latest edition of the following codes, unless the CO directs the Contractor otherwise. Any exception must be approved in writing by the CO prior to construction start-up:

1. International Building Code

2. International Mechanical Code

3. International Plumbing Code

4. National Electrical Code

5. National Fire Code

6. Uniform Federal Accessibility Standards

7. EM 385-1-1, US Army Corps of Engineers Safety Manual 8. ADAAG, Americans with Disabilities Act Accessibility Guidelines 9. Unified Facilities Guide Specifications (UFGS). These specifications can be accessed and downloaded online at http://www.wbdg.org.
10. Where appropriate, or required by executive order/Government regulation, the contractors shall install green procurement of environmentally preferable products as indicated in the U.S. EPA-designated Comprehensive Procurement guidelines (CPG) items. Federal agencies must reduce energy use, purchase energy-efficient products, increase the use of renewable energy, and conserve water. The Contractors are required to buy products that comply with federal energy efficiency requirements, and to design and operate buildings to minimize energy. The Department of Energy’s Federal Energy Management Program (FEMP) and the Energy Star program create the product lists for this Green Procurement Program element. Energy conservation requirements affect all building construction, renovation and maintenance Task Orders (TO).
c. Order of Precedence: Requirements included in the TO Statement of Objectives (SOO) shall take precedence over the contract specifications, drawings, sketches and other information provided in the base contract. For conflicts between requirements included in the SOO, the precedence shall be: 1.
2.
3.
4.

UFGS

Federal Codes
State Codes
Local Codes

The most stringent requirements shall apply, unless specifically requested in writing by the Government.

The beginning of the document. Download the full file to read on.