Combined Cover Sheet and Statement of Work FREDERICK HATCH
Updated
A PDF document (579 KB) attached to CGC Frederick Hatch U/W Hull Cleaning and Optional Zinc Repair, from the US Coast Guard. Due Nov 20, 2026, 10:00 AM (UTC-5).
File name: Combined Cover Sheet and SOW FREDERICK HATCH.pdf
The full file is for paid members, or buy this bid alone.
Preview
Statement of Work (SOW) Cover Sheet
CGC FREDERICK HATCH, Clean/Inspect/Video Underwater (U/W) Body Surfaces (renew failed zinc anodes)
Work Items:
Clean/Inspect/Video Underwater (U/W) Body Surfaces (renew failed zinc anodes)
1. REFERENCES:
COAST GUARD PUBLICATIONS
154-WPC MPC
B10015.D rev 10/31/24
154-WPC MPC
B10018.D rev 04/30/25
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1910, Subpart T, 7/16/2026, Commercial Diving Operations
2. REQUIREMENTS
See each work item for requirements. This SOW accomplishes MPC B10015.D and potentially B10018.D.
3. PERIOD OF PERFORMANCE (POP)
The POP for the requirement shall be between 12/01/26 - 12/11/26. Specific performance dates shall be coordinated with the Government POC to accommodate operational requirements. The contractor shall be available to perform the service during the specified POP window.
4. PLACE OF PERFORMANCE
The primary place of performance shall be at CGC FREDERICK HATCH located at below address:
CGC FREDERICK HATCH
NAVAL BASE GUAM
SANTA RITA Guam 96915
USA
POC: MKC Paul Kurkowski
Cell: (954) 999-7208
Email: [email protected]
5. SECURITY REQUIREMENTS
All contractor personnel requiring access to the place of performance in order to perform work under this contract must possess a valid-state issued REAL ID-compliant driver’s license or identification card, or an acceptable alternative form of identification as defined by the Department of Homeland Security (DHS) [https://www.dhs.gov/real-id]. It is the contractor’s responsibility to ensure that all personnel are properly credentialed to gain base access. Failure to comply with access requirements may result in delays to performance and will not constitute an excusable delay.
Statement of Work (SOW)
Clean/Inspect/Video Underwater (U/W) Body Surfaces
(renew failed zinc anodes)
1. SCOPE
1.1 Intent: While the vessel is moored pier side, clean the vessel’s U/W body and (pending inspection) renew bolt-on zinc anodes (if needed).
CUTTER
USCGC FREDERICH HATCH (Hull #1143)
ADDRESS
NAVAL BASE GUAM
SANTA RITA Guam 96915
USA
Period of Performance (POP)
12/01/26 thru 12/11/26
CUTTER POC
MKC Paul Kurkowski, (954) 999-7208, [email protected]
1.2 Government-furnished property.
MTI
ITEM DESCRIPTION
N
Anode, stern tube
N
Nut, Self-Locking
N
Anode, Sea Chest Grate
N
Screw, Prop zinc plate
N
Screw, Sea Chest Grate
Anode,
Screw Cap, Stern Tube
Covers
Zinc plate, propeller
N
N
N
N
Anode, Bow Thruster, Gear
Case, Bolt On
Anode, Bow Thruster,
Tunnel, Bolt On
The beginning of the document. Download the full file to read on.