Home / CGC Frederick Hatch U/W Hull Cleaning and Optional Zinc… / Document

Combined Cover Sheet and Statement of Work FREDERICK HATCH

Updated

A PDF document (579 KB) attached to CGC Frederick Hatch U/W Hull Cleaning and Optional Zinc Repair, from the US Coast Guard. Due Nov 20, 2026, 10:00 AM (UTC-5).

File name: Combined Cover Sheet and SOW FREDERICK HATCH.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Statement of Work (SOW) Cover Sheet

CGC FREDERICK HATCH, Clean/Inspect/Video Underwater (U/W) Body Surfaces (renew failed zinc anodes)

Work Items:
Clean/Inspect/Video Underwater (U/W) Body Surfaces (renew failed zinc anodes)

1. REFERENCES:

COAST GUARD PUBLICATIONS

154-WPC MPC

B10015.D rev 10/31/24

154-WPC MPC

B10018.D rev 04/30/25

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1910, Subpart T, 7/16/2026, Commercial Diving Operations

2. REQUIREMENTS

See each work item for requirements. This SOW accomplishes MPC B10015.D and potentially B10018.D.

3. PERIOD OF PERFORMANCE (POP)

The POP for the requirement shall be between 12/01/26 - 12/11/26. Specific performance dates shall be coordinated with the Government POC to accommodate operational requirements. The contractor shall be available to perform the service during the specified POP window.

4. PLACE OF PERFORMANCE

The primary place of performance shall be at CGC FREDERICK HATCH located at below address:

CGC FREDERICK HATCH

NAVAL BASE GUAM

SANTA RITA Guam 96915

USA
POC: MKC Paul Kurkowski
Cell: (954) 999-7208
Email: [email protected]

5. SECURITY REQUIREMENTS

All contractor personnel requiring access to the place of performance in order to perform work under this contract must possess a valid-state issued REAL ID-compliant driver’s license or identification card, or an acceptable alternative form of identification as defined by the Department of Homeland Security (DHS) [https://www.dhs.gov/real-id]. It is the contractor’s responsibility to ensure that all personnel are properly credentialed to gain base access. Failure to comply with access requirements may result in delays to performance and will not constitute an excusable delay.

Statement of Work (SOW)
Clean/Inspect/Video Underwater (U/W) Body Surfaces
(renew failed zinc anodes)

1. SCOPE

1.1 Intent: While the vessel is moored pier side, clean the vessel’s U/W body and (pending inspection) renew bolt-on zinc anodes (if needed).

CUTTER

USCGC FREDERICH HATCH (Hull #1143)

ADDRESS

NAVAL BASE GUAM

SANTA RITA Guam 96915

USA

Period of Performance (POP)

12/01/26 thru 12/11/26

CUTTER POC

MKC Paul Kurkowski, (954) 999-7208, [email protected]

1.2 Government-furnished property.
MTI

ITEM DESCRIPTION

N

Anode, stern tube

N

Nut, Self-Locking

N

Anode, Sea Chest Grate

N

Screw, Prop zinc plate

N

Screw, Sea Chest Grate
Anode,
Screw Cap, Stern Tube
Covers
Zinc plate, propeller

N
N
N
N

Anode, Bow Thruster, Gear
Case, Bolt On
Anode, Bow Thruster,
Tunnel, Bolt On

The beginning of the document. Download the full file to read on.