SECTION 01 11 00
SUMMARY OF WORK
PART 1
1.1
1.1.1
GENERAL
WORK COVERED BY CONTRACT DOCUMENTS
Project Description
The work includes all items of work as described in the attached project description.
1.1.2
Location
The work shall be located at the Marine Corps Base Camp Lejeune, North Carolina, at the building and/or area as described in the attached project description. The exact location will be indicated by the Contracting Officer.
1.2
PHASED CONSTRUCTION SCHEDULE
Within the overall project schedule, commence and complete the work in phases as described in the attached project description. 1.3
EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
1.4
a.
Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b.
Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
LOCATION OF UNDERGROUND FACILITIES
The Contractor will be responsible for obtaining the services of a professional utility locator to scan the construction site with electromagnetic or sonic equipment, and mark the surface of the ground where existing underground utilities are discovered. Verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
SECTION 01 11 00
1.4.1
Notification Prior to Excavation
Notify the Contracting Officer's Representative (COR)
starting excavation work.
1.5
48 hours prior to
GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
Government furnished material and equipment will be indicated on drawings and in scope of work if applicable.
PART 2
PRODUCTS
Not used.
PART 3
EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00
SECTION 01 14 00
WORK RESTRICTIONS (MCBL)
PART 1
1.1
GENERAL
SUBMITTALS
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
1.2
1.3
SPECIAL SCHEDULING REQUIREMENTS