SECTION 01 00 00
GENERAL REQUIREMENTS
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
i
06-01-15
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work to renovation and construction at the as required at the Wilmington VA Healthcare System, located at 1601 Kirkwood HWY, Wilmington, Delaware 19805 as required by drawings, specifications, and the scope of work.
B. Visits to the site by Bidders may be made only by appointment with the COR.
C. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I. GENERAL CONSTRUCTION: Perform all work required to complete the scope of work: Work includes general construction, alterations, finishes, fire protection, and fire alarm.
B. ITEM II. Electrical Work:
Perform all work required to complete the
scope of work: Work includes all labor, materials, equipment and
supervision to perform the required electrical construction work on this project including lighting, back power, access control. C. ITEM III. Mechanical Work: HVAC and duct system.
Work include all
labor, materials, equipment and supervision to perform the required mechanical construction work on this project including duct system, HVAC, ACH and negative air pressure.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's
expense.
01 00 00 -1
06-01-15
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security
procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all subcontractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge.
They may also be subject to inspection
of their personal effects when entering or leaving the project site. 2. Before starting work the General Contractor shall give one week’s