Home / 12445127B0002 AZ Halfmoon Ranch House HVAC Installation / Document

Complete Package

Updated

A PDF document (1.4 MB) attached to 12445127B0002 AZ Halfmoon Ranch House HVAC Installation, from the Forest Service. Due Dec 7, 2026, 1:00 PM (UTC-6).

File name: C04 12445127B0002 Complete Package.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SOLICITATION, OFFER,

AND AWARD

1. SOLICITATION NO.

12445127B0002

(Construction, Alteration, or Repair)

2. TYPE OF SOLICITATION

x

3. DATE ISSUED

SEALED BID (IFB)

INVITATION FOR BID

NEGOTIATED (RFP)

REQUEST FOR PROPOSAL

PAGE OF PAGES

11/02/2026

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror. 4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

1166742

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

4451

USDA-FS CSA EAST 11

1720 PEACHTREE ST NW

STE 876S

ATLANTA GA 30309-2449

9. FOR

INFORMATION CALL

Adam Doyle / [email protected]
cc: Charles Cotton / [email protected]

SUBJECT LINE SHALL READ:

SOLICITATION_12445127B0002

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

a. NAME

ADAM

DOYLE

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

(Title, identifying no., date)

Project Title: AZ Halfmoon Ranch House HVAC Installation Original Set Aside: The project is set-aside 100% for small businesses per FAR 19.5. NAICS Code: 238220 - Plumbing, Heating, and Air-Conditioning Contractors (size standard $19m). PSC: N041 - Installation of Equipment - Refrigeration, Air Cond. Location: Coronado National Forest, Douglas Ranger District (Cochise County, AZ). See Attachment 003 Statement of Work and Specifications for specific location. Scope of Work (summarized): See Attachment 003 Statement of Work and Specifications for specific details not included under this paragraph. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals, supervision, and safety measures necessary to complete this project. This project involves installing three ductless, split unit climate control system in Halfmoon Ranch, a historic house located in a remote and rural location. Currently there is no climate control system in the building.
Award of Contract: A single award will be made to the overall lowest priced responsive/responsible bidder.
Tentative Dates:
Site(s) Visit/Pre-Bid Conference (if needed): 11/10/2026 - POC Lauren Atkinson, [email protected]
Date for Questions: 11/30/2026.
Bid Submittal Deadline: 12/07/2026, 1300 CT.
Delivery: 60 Days After Notice to Proceed Period of
Performance: 60 Days After Notice to Proceed
Submittal Method: All proposals will be emailed to [email protected] and cc [email protected] *Payment and Performance Bonds MUST be Furnished if bid exceeds $35,000.00

The beginning of the document. Download the full file to read on.