Complete Package
Updated
A PDF document (5.8 MB) attached to 12445127B0001 AZ Lakeside Office Sewer Line Replacement, from the Forest Service. Due Dec 14, 2026, 1:00 PM (UTC-6).
File name: C04 12445127B0001 Complete Package.pdf
The full file is for paid members, or buy this bid alone.
Preview
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
1. SOLICITATION NO.
12445127B0001
(Construction, Alteration, or Repair)
x
3. DATE ISSUED
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
PAGE OF PAGES
11/02/2026
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror. 4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
1159395
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
4451
USDA-FS CSA EAST 11
1720 PEACHTREE ST NW
STE 876S
ATLANTA GA 30309-2449
9. FOR
INFORMATION CALL
Adam Doyle / [email protected]
cc: Charles Cotton / [email protected]
SUBJECT LINE SHALL READ:
SOLICITATION_12445127B0001
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
a. NAME
ADAM
DOYLE
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
(Title, identifying no., date)
Project Title: AZ Lakeside Office Sewer Line Replacement Original Set Aside: The project is set-aside 100% for small businesses per FAR 19.5. NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction (size standard $39.5M). PSC: Z2AA - Repair or Alteration of Office Buildings
Location: Apache-Sitgreaves National Forest, Lakeside Ranger District (Navajo County, AZ). See Attachment 003 Statement of Work and Specifications for specific location. Scope of Work (summarized): See Attachment 003 Statement of Work and Specifications for specific details not included under this paragraph. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals, supervision, and safety measures necessary to complete this project. This project involves removal and replacement of the existing sanitary sewer service lateral serving the US Forest Service Lakeside District office and installation of a new sewer line connection to the Pinetop–Lakeside Sanitary District (PLSD) public sewer main. Work will include excavation, installation, surface restoration, and all associated testing required for acceptance by PLSD and the Owner.
Tentative Dates:
Site Visit/Pre-Bid Conference (if needed): 11/17/2026- POC Pamela Jaramillo, [email protected] Date for Questions: 11/30/2026.
Bid Submittal Deadline: 12/14/2026, 1300 CT.
Delivery: 30 Days After Notice to Proceed
Period of Performance: 30 Days After Notice to Proceed
Submittal Method: All proposals will be emailed to [email protected] and cc [email protected]
The beginning of the document. Download the full file to read on.