Contract Data Requirements List
Updated
A PDF document (2.0 MB) attached to Seal & O-Ring, from the Department of the Air Force. Due Oct 29, 2026, 4:30 PM (UTC-4).
File name: CDRL.pdf
The full file is for paid members, or buy this bid alone.
Preview
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
D. SYSTEM/ITEM
TDP
TM
E. CONTRACT/PR NO.
See Blk 16
1. DATA ITEM NO.
PR# FD20202600989
2. TITLE OF DATA ITEM
A001
OTHER
F. CONTRACTOR
17. PRICE GROUP
3. SUBTITLE
Test/Inspection Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
SD
9. DIST STATEMENT
REQUIRED
8. APP CODE
A
See Blk 16
18. ESTIMATED
TOTAL PRICE
6. REQUIRING OFFICE
DI-NDTI-80809B/T
7. DD 250 REQ
NSP
First Article Test Report
414 SCMS/GUEA
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
See Blk 16
14.
b. COPIES
13. DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
See Blk 16
a. ADDRESSEE
Block D:
NIIN: 010818892; PN: 76D41637P1; Description: Packing, Preformed
Final
Draft
See Blk 16
16. REMARKS
$0
DISTRIBUTION
See Blk 16
Reg
809 MXSS/MXDEB
Repro
SEE BLOCK 16
Block 4: Contractor format acceptable.
Paragraph 10.2 of DI-NDTI-80809B clarified as follows:
a. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.
b. Materials used in the manufacture of the "First Article" shall be identified and certified along with a copy of material purchase requirements as conforming to applicable data requirements.
c. Material processing, including finish requirements (plating, heat treatment, welding, anodizing, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of
The beginning of the document. Download the full file to read on.