Home / 5935 - 01-678-7255 SWA5 MK48 Torpedo Receptacle (Ethernet) / Document

Contract Data Requirements List

Updated

A PDF document (529 KB) attached to 5935 - 01-678-7255 SWA5 MK48 Torpedo Receptacle (Ethernet), from the Department of the Navy. Due Nov 23, 2026, 2:00 PM (UTC-5).

File name: CDRLs_26RK069.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Form Approved

CONTRACT DATA REQUIREMENTS LIST

OMB No. 0704-0188

(1 Data Item)
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (07040188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A.CONTRACT LINE ITEM NO.
0001AA

D. SYSTEM/ITEM

B. EXHIBIT

E. CONTRACT/PR NO.

C. CATEGORY:

TDP
TM

OTHER

F. CONTRACTOR

4T 5935-01-678-7255 (SWA5)

1.DATA ITEM NO.

2.TITLE OF DATA ITEM

A001

Test Procedure

3.SUBTITLE

17.PRICE GROUP

4.AUTHORITY (Data Acquisition Document No.)

5.CONTRACT REFERENCE

6.REQUIRING OFFICE

DI-NDTI-80603A

7.DD250 REQ

9.DIST STATEMENT

REQUIRED

SD

ALL DRAWINGS

12.DATE OF FIRST

SUBMISSION

NUWC NEWPORT

8.ADP CODE

D

A

10.FREQUENCY

ONE TIME

11.AS OF

DATE

30 DAC

13.DATE OF SUBSEQUENT

SUBMISSION

18.ESTIMATED

TOTAL PRICE

14.DISTRIBUTION

b. COPIES

a. ADDRESSEE

Draft
Reg

16.REMARKS

THE PLAN IS TO SPECIFY PROCESS CONTROL INSTRUCTIONS AND INSPECTION

PROCEDURES NEEDED TO ENSURE PRODUCT CONFORMANCE TO DRAWINGS,

SPECIFICATIONS, AND CONTRACT REQUIREMENTS IAW ISO 9001 AND ASQC Q9000

SERIES. THE PLAN IS TO INCLUDE FIRST ARTICLE AND PRODUCTION LOT

QUALITY CONFORMANCE INSPECTION PROCEDURES IAW DI-NDTI-80603A ALONG

WITH ALL APPLICABLE DATA ENTRY SHEETS TO BE USED TO DOCUMENT PROCESS

INSPECTIONS.

BLK 14: DISTRIBUTION ADDRESS

1. NAVSUP Weapon Systems Support

2. NAVSUP Ammunition Logistics Center

3. Naval Surface Warfare Center

POC Information: See Section H

SEE BLOCK 16

Final
Repro

15.TOTAL

G. PREPARED BY:

Richard Rzomp

DD Form 1423-1, FEB 2001

H. DATE

I. APPROVED BY:

5/9/2025
John Knecht

PREVIOUS EDITION MAY BE USED

Page

J. DATE

5/9/2025

of

Pages

Form Approved

CONTRACT DATA REQUIREMENTS LIST

OMB No. 0704-0188

(1 Data Item)
The public reporting burden for this collection of information is estimated to average 220 hours per response,

The beginning of the document. Download the full file to read on.

Other documents in this bid