Home / Deep Pit Furnace / Document

Contract Data Requirements List

Updated

A PDF document (322 KB) attached to Deep Pit Furnace, from the Department of the Army. Due Nov 17, 2026, 6:00 PM (UTC-6).

File name: 26-3-25 CDRL.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Form Approved

OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

( 1 Data Item )

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

F. CONTRACTOR

Deep Pit Furnace
1. DATA ITEM NO.

2. TITLE OF DATA ITEM

3. SUBTITLE

Installation and Preparation Documentation

Equipment Characteristics

4. AUTHORITY (Data Acquisition Document No.)

7. DD250 REQ

9. DIST

STATEMENT

REQUIRED

8. APP CODE

5. CONTRACT REFERENCE

10. FREQUENCY

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16 SEE BLOCK 16

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16 SEE BLOCK 16

16. REMARKS

6. REQUIRING OFFICE

14.

DISTRIBUTION

b.

COPIES

Final

a.

ADDRESSEE

Draft
Reg

Repro

SEE BLOCK 16

The contractor shall provide a copy of this information in either electronic or paper format, no later than 30-calendar-days after award of the contract. The contractor shall provide this information in electronic format using Microsoft Excel format.
The specific data required is:
Identify required info from LMP

CAPACITY_LBS

SITE_CODE

HEAT_SOURCE

TEMP_MAX

HEAT_TREAT_TYPE

WORK_DIA_MAX

HEATING_UNIT_CONFIG

WORK_HEIGHT

HEATING_UNIT_USE

WORK_LENGTH

MACHINE_GROUP

WORK_WIDTH

OUTPUT_RATING_KW

POWER_TYPE

PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:

Rock Island Arsenal

ATTN: TARA-LGC

David Holgorsen
2744 Rodman Ave (B220-B-D28)
Rock Island, IL 61299-6400

15. TOTAL

G. PREPARED BY

H. DATE

Dane Taghon

18-Aug-2026

DD Form 1423-1, SEP 97 (EG) (Computer Generated)

I. APPROVED BY

PREVIOUS EDITIONS ARE OBSOLETE

J. DATE

Page

of

Pages

Form Approved

OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

( 1 Data Item )

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing

The beginning of the document. Download the full file to read on.

Other documents in this bid