Contract Data Requirements List
Updated
A PDF document (232 KB) attached to 1355-01-620-4752 CWRT Wire Coil, Short, from the Department of the Navy. Due Nov 5, 2026, 2:00 PM (UTC-5).
File name: CDRLs_26RK012.pdf
The full file is for paid members, or buy this bid alone.
Preview
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0001
D. SYSTEM/ITEM
4T 1355-01-620-4752
1. DATA ITEM NO.
A001
B. EXHIBIT
TDP ☐
E. CONTRACT/PR NO.
CWRT
3. SUBTITLE
17. PRICE GROUP
Test Procedure
5. CONTRACT REFERENCE
9. DIST STATEMENT
REQUIRED
D
8. ADP CODE
10. FREQUENCY
ONE TIME
11. AS OF DATE
A
16.REMARKS
THE PLAN IS TO SPECIFY PROCESS CONTROL INSTRUCTIONS AND INSPECTION
PROCEDURES NEEDED TO ENSURE PRODUCT CONFORMANCE TO DRAWINGS,
SPECIFICATIONS, AND CONTRACT REQUIREMENTS IAW ANSI/ASQC Q9000-2000 OR
EQUIVALENT. THE PLAN IS TO INCLUDE FIRST ARTICLE AND PRODUCTION LOT
QUALITY CONFORMANCE INSPECTION PROCEDURES IAW DI-NDTI-80603A ALONG
WITH ALL APPLICABLE DATA ENTRY SHEETS TO BE USED TO DOCUMENT PROCESS
INSPECTIONS.
BLK 14: Distribution List
1. Contract Administration Office (CAO)
2. NAVSUP WSS Contracting Officer N772
3. NAVSUP ALC, Code A151
4. NUWC-Keyport Code N321
See section H for distribution POC’s and their emails.
6. REQUIREING OFFICE
ALL DRAWINGS
DI-NDTI-80603A
DD
TM ☐
OTHER ☐
F. CONTRACTOR
2. TITLE OF DATA ITEM
4. AUTHORITY (Data Acquisition Document No.)
7. DD 250 REQ
C. CATEGORY:
12. DATE OF FIRST
SUBMISSION
60 DADC
13. DATE OF SUBSEQUENT
SUBMISSION
18. ESTIMATED TOTAL
PRICE
KEYPORT
14.
DISTRIBUTION
b. COPIES
a. ADDRESSEE
Draft
SEE BLOCK 14
Final
Reg
Repro
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
Richard Rzomp
26 SEP 2025
John Knecht
DD FORM 1423-1, FEB 2001
J. DATE
26 SEP 2025
Page
PREVIOUS EDITION MAY BE USED.
CONTRACT DATA REQUIREMENTS LIST
The beginning of the document. Download the full file to read on.