CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
(1 Data Item)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
A
MISC
TBD
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Closure Protective Covers
TBD/TBD
TBD
:
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
A001
Certificate of Compliance (CoC)
17. PRICE GROUP
3. SUBTITLE
4. AUTHORITY (Date Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MISC-81356A
SOW 4.1
NUWCDIVNPT CODE 45
7. DD 250 REQ
10. FREQUENCY
9. DIST STATEMNT
REQUIRED
LT
SEE BLK 16
8. APP CODE
D
N/A
SEE BLK 16
11. AS OF DATE
N/A
12. DATE OF FIRST
SUBMISSION
14.
b. COPIES
13. DATE OF SUBSEQNT
SUBMISSION
a. ADDRESSEE
NUWC TPM
NUWC COR
15. TOTAL
Page
of _2
Pages
Final
Draft
Reg
Repro
SEE BLK 16
Block 4: Contractor format is acceptable.
Block 9: See Distribution Statement Addendum.
Block 10, 12: The Contractor shall document compliance with the JCM-14865 REV M drawing package by delivering a Certificate of Compliance (CoC) for the Closure Protective Covers (CPCs). The CoC submittal shall contain all material validations,
certifications, and test documentation including but not limited to the following:
•
JCM-14308 Adhesive, Epoxy, Filled
o
Certificate of Conformance per Note 7 IAW Note 4
•
JCM-14865 Closure Protective Cover MK 19 Mod 0
o
Certificates of Conformance and test data from
Note 10 and Note 27.
•
JCM 14866 Hemispherical Shell Assembly
o
Results from Notes 5 and 6.
•
JCM-14870 Screw, Cap, Socket Head
o
ASTM-B-633 Type II Class 3 conformance
o
IAW Note 8; Yield Strength Test to 170 KSI
•
JCM-14874 Hose, Assembly
o
Certificate of Conformance and test results from