Department of Veteran Affairs
Correct Electrical Deficiencies
Fayetteville VA Medical Center
Fayetteville, NC
Construction Documents (CD)
Specifications
18 November 2025
VA Project #565-22-500
SES Project #23087
Correct Electrical Deficiencies
Fayetteville VAMC, Fayetteville, NC
VA Project #565-22-500
CD Submittal
11/18/2025
Version 05-01-24
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
Section 00 01 10
SECTION NO
00 01 15
DIVISION AND SECTION TITLES
DIVISION 00 - SPECIAL SECTIONS
List of Drawing Sheets
DATE
05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00
01 32 16.13
01 33 23
01 35 26
01 42 19
01 45 00
01 57 19
01 58 16
01 74 19
01 91 00
General Requirements
Network Analysis Schedules –Construction Project
Design-Bid-Build
Shop Drawings, Product Data, and Samples
Safety Requirements
Reference Standards
Quality Control
Temporary Environmental Controls
Temporary Interior Signage
Construction Waste Management
General Commissioning Requirements
11-21
05-22
06-25
05-24
11-20
02-21
01-21
07-15
04-22
04-22
DIVISION 02 – EXISTING CONDITIONS
02 41 00
02 82 11
02 83 33.13
Demolition
Traditional Asbestos Abatement
Lead-Based Paint Removal and Disposal
08-17
01-21
01-21
DIVISION 03 – CONCRETE
03 30 00
Cast-in-Place Concrete
01-21
DIVISION 04 – MASONRY
04 05 13
04 05 16
04 20 00
Masonry Mortaring
Masonry Grouting
Unit Masonry
10-17
01-21
08-17
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00
Rough Carpentry
10-17
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 27 26
07 31 26
07 60 00
Fluid-Applied Membrane Air Barrier, Vapor Permeable
Slate Shingles
Flashing and Sheet Metal
00 01 10-1
01-21
01-21
01-21
Correct Electrical Deficiencies
Fayetteville VAMC, Fayetteville, NC
VA Project #565-22-500
SECTION NO
07 84 00
07 92 00
Firestopping
Joint Sealants
CD Submittal
11/18/2025
Version 05-01-24
DIVISION AND SECTION TITLES
DATE
01-21
04-22
DIVISION 08 - OPENINGS
08 11 13
08 71 00
08 90 00
Hollow Metal Doors and Frames
Door Hardware
Louvers and Vents
01-21
03-24
01-21
DIVISION 09 – FINISHES
09 06 00
09 67 23.30
09 91 00
Schedule for Finishes
Resinous (Epoxy Resin Composition) Mortar Flooring
(RES-3)
Painting
01-21
05-24
01-21
DIVISION 22 – PLUMBING
22 05 11
22 11 00
22 13 00
Common Work Results for Plumbing
Facility Water Distribution
Facility Sanitary and Vent Piping
01-23
05-21
09-20
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11
23 05 12
23 05 41
23 05 93
The beginning of the document. Download the full file to read on.