CSS Commerical Products and Services Eddyville
Updated
A PDF document (341 KB) attached to Eddyville Quarters Window Replacement, from the Forest Service. Due Nov 16, 2026, 9:00 AM (UTC-5).
File name: C01_CSS_Commerical Products and Services Eddyville_12444526Q0082.pdf
The full file is for paid members, or buy this bid alone.
Preview
Eddyville Quarters Window Replacement
Solicitation Number: 12444526Q0082
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12444526Q0082 is issued as a Request for Quotation (RFQ) for Solicitation number is issued as a Request for Quotation (RFQ) for Commercial Construction (Simplified Acquisition). The contractor shall provide all certified labor, equipment, and materials necessary to physically remove and dispose of nineteen (19) existing residential windows and provide, fit, insulate, seal, and install new energy-efficient white vinyl-clad windows at the occupied Eddyville Quarters facility. This procurement is classified as a commercial action for supplies and services under FAR Part 12 and FAR Part 13, and the service component is subject to the Service Contract Labor Standards (Service Contract Act)."
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 561790 The small business size standard is $9.0 This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Statement of Requirement
The U.S. Department of Agriculture (USDA), Forest Service, requires the procurement, delivery, physical removal, and lawful disposal of old windows, followed by the installation of nineteen (19) new energy-efficient white vinyl-clad windows at the occupied Eddyville Quarters facility located in Pope County, Illinois (Hidden Springs Ranger District, Shawnee National Forest). The Contractor shall provide all labor, supervision, specialized tools, protective gear, transport vehicles, insurance, and construction materials necessary to complete the project in an incident-free, structurally sound, and weather-tight manner.
Overview: The contractor is required to perform complete structural removal, offsite disposal, product provision, and weather-tight installation of energy-efficient windows matching the exact window schedules and dimensions verified via field checking. Staging & Operating Constraints: Work will be performed on an occupied residence. Windows removed must be completely replaced within the same calendar day to preserve building envelope integrity. Noise or disturbances to surrounding residents are strictly prohibited between the hours of
The beginning of the document. Download the full file to read on.