D Wage Determination
Updated
A PDF document (55 KB) attached to IRS Intrusion Detection System, C. Clifton Young Federal Building & US Courthouse, from the Public Buildings Service. Due Nov 2, 2026, 4:00 PM (UTC-8).
File name: D_WD NV20260093_2026 07 30.pdf
The full file is for paid members, or buy this bid alone.
Preview
"General Decision Number: NV20260093 07/30/2026
State: Nevada
Construction Types: Building
Counties: Nevada Counties of
Washoe
Modification Number
Publication Date
06/22/2026
07/30/2026
SANV2025-001 10/01/2025
Rates
Electrician-Communication Technician: Communication
Electrician-Lineman/Groundman/Heavy Equipment
Electrician-Lineman/Groundman/Heavy Equipment
Electrician-Lineman/Groundman/Heavy Equipment
Laborers: Group 1 (All cleanup work of debris,
grounds, and building including windows and tile;
Dumpmen or Spotter (other than asphalt); Handling
and Servicing of Flares; General Laborer;
Guideposts and Highway Signs; Guardrail Erection
and Dismantling; Limber, Brushloader and Piler;
Pavement Marking and Highway Striping; Traffic
Barrier Erector; Tending to portable space heaters;
Fringes
33.51
0.00
0.00
18.44
25.29
13.86
0.00
22.88
22.23
26.05
0.00
30.66
29.99
47.89
17.58
17.58
19.41
0.00
17.58
17.58
17.58
17.58
39.12
17.58
17.58
17.58
17.58
Profilograph work all types manual, self propelled
or carts; Gabion basket, building, handling,
installation and rigging; Dry set paver work;
Laborers: Group 2 (Choker setter or Rigger
(clearing work only) Pittsburgh; Chipper and
similar type brush shredders; Concrete worker (wet
or dry) all concrete work not listed in Group 3
included but not limited to: concrete forms
stripping, handling, cleaning, oiling and moving to
the next point of installation.; Crusher or Grizzly
Tender; Greasing Dowels; Guinea Chaser (Stakemen);
Panel Forms (wood or metal) handling, cleaning and
stripping of Loading and unloading, (Carrying and
handling of all rods and material for use in
reinforcing concrete; Railroad Trackmen
(maintenance, repair or builders); Sloper;
Semi-Skilled Wrecker (salvaging of building
materials other than those listed in Group 3);
Waterproofing work; Epoxy rebar/dowels and
anchoring dowel baskets; Placement pouring of
concrete including any epoxy resin or similar
materials, rodding, spreading and tamping concrete,
brooming or brushing, hand application of curing
compounds, applying topping (wet or dry) colors or
grits, and exposed finishes for architectural work;
Concrete patching, dry packing, chipping, stoning,
and grouting; Concrete cold weather/rain protection
and curing; Placement /anchoring of all earth
The beginning of the document. Download the full file to read on.