Draft 309 AMARG LCBB Statement of Work
Updated
A PDF document (866 KB) attached to Large Component Blast Booth, 309 Aerospace Maintenance and Regeneration Group (AMARG), Davis-Monthan AFB, AZ 85707, from the Department of the Air Force. Due Dec 18, 2026, 5:00 PM (UTC-7).
File name: DRAFT 309 AMARG LCBB SOW (09NOV26).pdf
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK (SOW)
LARGE COMPONENT BEAD BLAST BOOTH WITH
PRE-ENGINEERED METAL BUILDING
UNITED STATES AIR FORCE
OGDEN AIR LOGISTICS COMPLEX (OO-ALC)
09 November 2026
1. DESCRIPTION OF REQUIREMENT
1.1. Provide a complete and Turn-Key design, construction, and installation of a new corrosion control facility at the 309th Aerospace Maintenance and Regeneration Group (AMARG), located within a controlled area of Davis-Monthan Air Force Base (DMAFB), Arizona. The primary function is the corrosion control of Aerospace Ground Equipment (AGE) and other ferrous related items. The media blast booth will be housed within a fully enclosed Pre-Engineered Metal Building (PEMB) that also provides a separated maintenance support operations area (MX Ops Area). The entire facility shall be constructed on a currently unimproved site located North of Building 7213 (the Small Paint Booth), see Appendix A.
1.2. The performing contractor is responsible for providing all management, professional services, labor, materials, and equipment to deliver a fully functional and operational facility. The scope includes, but is not limited to, the following key tasks:
1.2.1. The Contractor shall be responsible for developing a complete design package, which shall be stamped and certified by licensed Professional Engineer(s) and Fire Protection Engineer(s) registered in any of the 50 United States.
1.2.2. Plastic Media Blast Booth: Furnish, install, and commission a complete, stand-alone system. The system must be appropriately sized for various AGE (Section 4.10.), include media recovery and dust collection systems, associated controls, safety features, IAW hazardous location requirements. 1.2.3. PEMB (~60’ x 100’): Design, furnish, and erect a new, permanent, weather-tight metal building to fully enclose the blast booth, and provide a separate maintenance operations area. The structure must be fully compliant with all, but not limited to, architectural and engineering standards outlined in the DMAFB Design Compatibility Guidelines.
1.2.4. Utilities and Site Work: Identify, design, and construct all supporting utility infrastructure; electrical, water, sanitary sewer, etc. This includes all site work, foundations, grading, drainage, and paving necessary to support the new facility.
1.3. Applicable guidance, regulations, & standards.
1.3.1. As the Designer of Record, the Contractor is solely responsible for research, identification, and compliance with all federal, state, local, and Department of Defense and/or War guidance,
The beginning of the document. Download the full file to read on.