Draft BPA Performance Work Statement - FRCSW NLG Steering Collars
Updated
A PDF document (172 KB) attached to Intent to Sole Source Teflon Collars, from the Department of the Navy. Due Nov 13, 2026, 4:00 PM (UTC-5).
File name: DRAFT BPA PWS - FRCSW NLG Steering Collars.pdf
The full file is for paid members, or buy this bid alone.
Preview
Nose Landing Gear Steering Collar Service
Performance Work Statement
1. Scope:
1.1. This Performance Work Statement (PWS) identifies the acquisition framework necessary to establish an “off-site” Blanket Purchase Agreement (BPA) to apply and machine the KAron liner profile configuration for the F/A-18EFG NLG Steering Collar, Government-owned assets inducted for repair at Fleet Readiness Center Southwest (FRCSW), Naval Air Station (NAS) North Island, CA 92135-3058
2. Manufacturer Designation List:
2.1. The current equipment supported by this BPA is listed in Section 8. 3. Government Furnished Property (GFP) and Services:
3.1. The following list of GFP is subject to receive service under this BPA. It is current at the time of award and subject to change through contract modification. Manufacturer
Part Number
Safran
74A430612-1009
Safran
74A430612-1007
3.2. GFP and service information will be provided within each individual BPA call.
4. Applicable Documents:
4.1. Attachment 1 Cost Data Summary
4.2. Boeing 74A430611-2009 (REV C)
4.3. Kamatics KJB592696B-MOD (REV A) drawing
5. General Requirements:
5.1. The Contractor shall provide all labor, supervision, facilities, equipment, tools, and any other items and materials necessary to meet performance requirements as outlined by this PWS.
5.2. The Contractor must be knowledgeable and have the appropriate facility and experience with the application of the F/A-18EFG NLG Steering Collar KAron Liner in accordance with the documents referenced in Section 4 of this PWS. 5.3. The Contractor shall be a NAVAIR and Boeing approved source/supplier for the F/A18E/F/G Landing Gear Program.
5.4. The Contractor shall be able to perform all work and be able to communicate with the Technical Point of Contact (TPOC), both orally and in writing regarding issues and concerns during the repair/liner application process.
5.5. The Contractor shall provide and utilize its own facility, tools, equipment, and materials, including but not limited to, test equipment, support equipment, and NonDestructive Inspection (NDI) hardware necessary to perform the requested service. 5.6. The Contractor shall notify the TPOC when any material has shipped and provide the applicable tracking numbers.
5.7. The Contractor will be notified by the Government when completed material has been received.
5.8. The Contractor shall provide a production schedule through the TPOC. 5.9. The Contractor shall provide a specific address to the Government where to ship the
The beginning of the document. Download the full file to read on.