STATEMENT OF WORK

1.0 SCOPE

1.1 Introduction: This Statement of Work (SOW) establishes the requirement to evaluate the existing weight handling systems, including the building structure to which these are attached, their associated hangers, runway rails, pneumatic/electric traveling hoists, and control systems., Contractor is required to procure, replace, upgrade, and repair all components previously mentioned pertaining to the weight handling system. This SOW establishes the acquisition framework necessary to deliver weight handling system (WHS) solutions across multiple locations and buildings at Fleet Readiness Center Southwest (FRCSW).
1.2 Background: FRCSW is a major depot level maintenance center located at Naval Air Station, North Island, CA. FRCSW is an industrial activity that reworks, repairs, and overhauls various aircraft, engines, and components to support depot-level maintenance operations. FRCSW requires supplies and services for the repairs and replacements of multiple weight handling systems, including but not limited to, monorails, bridge cranes, jib cranes and gantry cranes of different capacities.
1.3 Specific Tasking: The contractor will be tasked by issuance of individual order to perform specific functions in accordance with the terms and conditions of the contract and within the scope of the SOW. Each Task Order/Delivery Order (TO/DO) will definitively identify the type of weight handling system, technical details, deliverable products and schedule requirements. For each specific TO/DO, a Performance Work Statement (PWS) or Statement of Work (SOW) and associated Quality Assurance Surveillance Plan (QASP) or Surveillance Activity Checklist (SAC) will be developed and incorporated into the TO/DO. Associated performance objectives, deliverables, and thresholds will be delineated in the individual TO/DO PWS or SOW as appropriate.

2.0 APPLICABLE DOCUMENTS

2.1 The documents listed below are the current version at the time this SOW was created. These documents may be revised at any time during the performance of the contract. Each applicable document listed below need to be referred to by the Contractor in order to successfully understand and be complaint with all aspects of the service described These applicable documents may be revised during the performance of the contract. Contractor shall comply with the latest version of each instruction and series update and address any changes to the instructions and notices after contract award. In the event of

The beginning of the document. Download the full file to read on.

Other documents in this bid