(Draft) MOC L4 Requirements 1
Updated
A PDF document (872 KB) attached to USGS L10 MOC & Operations Updates, from the Departmental Offices.
File name: LSDS-2388_(Draft)_L10_MOC_L4_Requirements_Nov_2026_1.pdf
The full file is for paid members, or buy this bid alone.
Preview
LSDS-2388
Version .9
Department of the Interior
U.S. Geological Survey
D
R
AF
T
Landsat 10 (L10) Mission Operations Center
Requirements Document (MOCRD)
Version .9
November 2026
Landsat 10 (L10) Mission Operations Center
Requirements Document (MOCRD)
November 2026
Approved By:
AF
G. R. Mah
Date
Landsat 10 Mission System Engineer
U.S. Geological Survey
T
Document Owner
D
R
Brian Sauer
Date
Landsat 10 Project Manager
U.S. Geological Survey
EROS
Sioux Falls, South Dakota
- ii -
LSDS-2388
Version .9
Executive Summary
Landsat represents the world’s longest continuously acquired collection of space-based moderate-resolution land remote-sensing data. The program’s imagery provides a unique resource for those who work in agriculture, geology, forestry, regional planning, education, mapping, and global change research. Landsat images are also invaluable for emergency response and disaster relief.
D
R
AF
T
This document contains the level-4 (L4) requirements for the Landsat 10 (L10) Mission Operations Center (MOC). Requirements are based on the scenarios described in the MOC Synopsis, LSDS-2424.
- iii -
LSDS-2388
Version .9
Document History
Document
Version
.9
Publication
Date
November 2026
Change
Number
–
D
R
AF
T
Document
Number
LSDS-2388
- iv -
LSDS-2388
Version .9
ID
Requirement
Rationale
Driving
Changing from specifically calling out a "bMOC" to
both match SMRD language and to acknowledge that
a specific bMOC facility may not be required in a
cloud-based architecture
Yes
General Requirements
The MOC shall provide a backup
capability
D
R
AF
T
Trace to GSRD 4787
Allocation:
The MOC shall have an availability of
The GS must have a highly available observatory
99.9% for telemetry and command
communication link to ensure observatory health &
functions
safety detection and response. Allocation: GNE 99.9%; MOC - 99.9%; Network - 99.9%. Continuity of Operations (COO) and backup
capability failover. A component is defined as any
The MOC shall restore component
item in the signal path or supporting the transmission
functionality within 48 hours of a
of a signal that prevents proper operation of the
detected failure
MOC, e.g. - a H/W encrypter box, network router,
non-redundant power supply, etc.
Trace to GSRD 23689
Trace to GSRD 22439
Rationale:
The MOC shall have an availability of
Mission-supporting functions in the MOC must be
98.5% for non-telemetry and
highly available, but are not subject to the strictness
The beginning of the document. Download the full file to read on.