PERFORMANCE WORK STATEMENT (PWS)

REMOVAL OF OLD FLUID CELL B140

14 OCTOBER 2026

1.0 DESCRIPTION OF SERVICES. The Contractor shall provide to the Maintenance Support Group (MXSG) all the tools, parts, materials, equipment, labor, and transportation necessary to decommission, remove, and dispose of one (1) Quintus ABB QFC 1.6 x 4-1400 fluid cell press. The equipment is located in building 140 at Robins Air Force Base (AFB), Georgia. Decommissioning services shall include dismantling, rigging, relocating the components to a designated on-base cutting site, reduction of major components to recyclable sizes, and hauling all resulting scrap and debris off Robins AFB.
1.1 The fluid cell assembly has been reduced to four (4) major components with estimated weights as detailed in the table below:
Component
Upper Filler Piece
Pressure Plate
Lower Filler Piece
Unwound Main Cylinder
Plating attached to Lower Filler

Weight
64,000 LBS
32,000 LBS
86,000 LBS
148,000 LBS
7,000 LBS
Total Weight 337,000 LBS

1.2 Equipment Configuration and Location. The two (2) filler pieces, pressure plate, and the plating attached to the lower filler are currently positioned inside the main cylinder. The entire main cylinder assembly is situated within a pit approximately 34 inches in depth. 1.3 Technical Removal Plan. Within fourteen (14) calendar days after contract award, the Contractor shall submit a Draft Technical Removal Plan to the Contracting Officer (CO) and the Government Representative for review. The plan shall detail the specific rigging, lifting, and transportation equipment to be utilized; cutting methods; and a comprehensive project schedule (including the exact start and estimated completion dates). The Government will have five (5) business days from receipt of the Draft Technical Review Plan to review, provide comments, and either approve or request revisions. If revisions are required, the Contractor shall incorporate the Government’s comments and submit the Final Technical Removal Plan within five (5) calendar days of receiving those comments. The Contractor shall not mobilized equipment or initiate any physical decommissioning, rigging, or removal work on-base until the Final Technical Removal Plan has received written approval from the Contracting Officer (CO). (CDRL A001, DIMGMT-81117 NOT 1, Technical Removal Plan) 1.4 Rigging and Removal Operations. The Contractor shall extract the components, either independently or as a unified assembly, from the pit and transport them out of building 140.

The beginning of the document. Download the full file to read on.