Home / Baumalight FGS952 Feller Buncher Attachment - Devens RFTA… / Document

Draft Scope Of Work Devens RFTA Feller Buncher Attachment v2

Updated

A Word document (33 KB) attached to Baumalight FGS952 Feller Buncher Attachment - Devens RFTA, MA, from the Department of the Army. Due Nov 20, 2026, 2:00 PM (UTC-5).

File name: DRAFT Scope Of Work Devens RFTA Feller Buncher Attachment v2.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Devens Reserve Forces Training Area (RFTA) Directorate of Plans, Training, Mobilization, and Security Fort Devens, Massachusetts 01434

SCOPE OF WORK

1 October 2026

Project Name:Devens RFTA Feller Buncher Attachment
Project Number:N/A
Project Location:Acquisition of Feller Buncher Attachment

Project POC: PRI:RFOS/QAR:Suzanne Richardson

General Information
Background Information:
A Feller Buncher attachment is required for performance of the annual core requirements of the Devens RFTA Integrated Training Area Management (ITAM) work plan. These core requirements consist of: Maintaining lines of sight for the impact area and mortar declination points; Maintaining heavy and light maneuver lands in accordance with (IAW) TC 25-1; Maintaining ten (10) landing zones;
Maintaining two (2) land navigation courses;
Maintaining maneuver trails; and
Remediation of maneuver damage & erosion control.
These requirements are currently performed by contractor at Devens RFTA using machinery compatible with the attachment being procured

Description of Work:
The contractor shall deliver to 1 Jackson Road, Devens MA the following: One (1) NEW- BAUMALIGHT FGS952 Feller Buncher Attachment. Safety Requirements: N/A Security Clearances:
N/A.

GENERAL VENDOR:

Shall furnish the equipment, materials, transportation, offloading of equipment, and any assembly in accordance with the specifications and allotted period of performance described in this Scope of Work (SOW).

The “On-Site Government Quality Assurance Representative” (QAR) will assign the Vendor a location for placement of their trailer upon request.

Is obligated to verify all measurements and specification requirements. No extra compensation shall be allowed for the Vendor who does not appreciate the difficulty of the contract specifications. Any discrepancies, ambiguities or changes must be verified and confirmed in writing to the Contracting Officer, Contracting Officer Representative (COR), and QAR.

Shall furnish all inquiries for equipment and/or materials that vary from requirements of this SOW. All inquiries are required to be turned in and approved by the QAR 30 days prior to ordering any of those materials.

Shall provide, unless otherwise specified, new and unused materials and/or installed equipment in the original manufacturer’s packaging.

Shall not perform any portion of this contract without notice to proceed.

Shall be solely responsible for ensuring compliance with the provisions of this contract by vendors.

The beginning of the document. Download the full file to read on.

Other documents in this bid