CUI
PERFORMANCE WORK STATEMENT
(PWS)
FOR
SERV M26-191
NITROGEN PIPING REPLACEMENT FOR PLASMA
SPRAY BOOTH
CUI
CUI
Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precautions to prevent accidents and preserve the health/safety of each contractor and government employee.
1.0 Section One
Description of Services
1.1 Scope: The Contractor shall provide all labor, tools, material, parts, equipment (including test equipment), transportation, quality control, inspection manuals, and expertise necessary to replace and install a 5,000 psi nitrogen gas piping system in Building 3001 at Tinker Air Force Base (AFB) in support of the Oklahoma City–Air Logistics Complex (OC-ALC). The specific equipment to be serviced or installed is detailed in Appendix A (On-Base). The Contractor shall be responsible for ensuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.
1.2 Requested Services: Contractor shall provide a complete, leak-free nitrogen piping system connecting the nitrogen generator, storage cylinders, regulator, and plasma spray booth. This includes the demolition of the existing nitrogen gas piping, the installation of new high-pressure 316 Stainless Steel pipe piping, and the replacement of pipe supports as needed.
1.2.1 Demolition of Existing Piping:
•
•
•
•
Contractor shall Demo existing nitrogen gas piping.
Performance Standard: All existing unserviceable piping must be safely disconnected and removed without causing damage to surrounding government property or major equipment.
How Monitored: Visual inspection by the Government Point of Contact (POC) during and after demolition.
All removed material that is not being reused will be returned to the Government (76 MXSG).
1.2.2 Installation of New Stainless Steel Piping
•
•
•
Requested Service: Install new high-pressure 316 Stainless Steel pipe to connect the nitrogen generator, storage cylinders, regulator, and plasma spray booth. Performance Standard: The piping system must be rated for a working pressure of 5,000
The beginning of the document. Download the full file to read on.