DRAWING
Updated
A PDF document (438 KB) attached to DRS M7A1 HDPE Platform, from the Department of the Army. Due Oct 30, 2026, 10:00 AM (UTC-4).
File name: DRAWING 1110701005P-RIA -.pdf
The full file is for paid members, or buy this bid alone.
Preview
Contract Quality Requirements Worksheet
261008101641
Requisition/WBS Number
JO_PCN
End Item
EH25MRI027EHM5
QA Specialist
Part Number
M7A1
Telephone
ROZKALNS
Date
5565
NSN/NIIN
1110701005P-RIA
Drawing Specification/Item
10/8/2026
ACETYLENE TANK PAD
Qualified Products/Producers List
X Government Actions will be performed by ACO-authorized Representative at Source - FAR 46.202, 46.405
X RIA-JMTC - FAR 46.403, 46.404
X Acceptance at
Source
X RIA-JMTC
Government Reliance on Inspection by Contractor - FAR 52.246-1 X Inspection by the Government - FAR 52.246-2
Higher-Level Contract Quality Requirements - FAR 52.246-11
ANSI/ISO/ASQ Q9001-2015
Other
Applicable Documents
Below
Attached
X Certificate of Conformance - FAR 52.246-15
Certified Test Report (CTR)
Please select
Product must be purchased from an AS9100
Certified Vendor
Government Designed Acceptance Inspection and Test Equipment (Attached) First Article Approval, Government Testing (Attached) - FAR 52.209-4 First Article Approval, Contractor Testing (Attached) - FAR 52.209-3 First Article Parts Required?
No
Yes - Quantity
First Article Parts will be:
Accepted as Part of the Production Run
Returned to Vendor
Preproduction Material Approval - Government Testing (Attached) Ballistic Testing (Attached)
Shelf Life:
FAR 46.706
DOD 4140.27M (not less than 85% shelf life remaining upon receipt)
X Other:
ITEMS MUST BE INSPECTED AND ACCEPTED BY RIA-JMTC INCOMING RECEIVING INSPECTION. Acetylene Tank Pad. Purchase parts compete per 1110701005 drawing, current revision. Parts must meet all drawing requirements, or they will be rejected back to the supplier. ***Important Note: See Note 2***
RIA FORM 702-2, Rev00
Previous Editions may not be used
The beginning of the document. Download the full file to read on.