STATEMENT OF WORK
ECAO FACILITY REFRESH – EXTERIOR DOOR REPLACEMENT
1. Project Overview
1.1 Purpose
Replace the 10 exterior door assemblies identified in this SOW and Attachment 5. Include frames when required, hardware, weather seals, and related components. At designated doors, connect new hardware to the existing card-access system and automatic operators. All doors must operate safely, resist weather and pest entry, and meet applicable code requirements.
1.2 Work Areas and Required Outcomes
Item
Location
Existing condition
Required finished outcome
Main Building/Main Level/Primary Entrance
(See Reference Photo 1)
The existing building’s main entrance features a set of full-lite, double metal‑framed doors serving as the main entrance. This door is accessed by card. Replace the double-door storefront entry. Include code-compliant hardware integrated with the existing card reader/security system. Restore affected surrounding areas. Main Building/Main Level/Interior Vestibule Doors (See Reference Photo 2) Immediately beyond the main entrance vestibule, a second set of full-lite, double doors with metal‑framed provides access further into the building. No key card is necessary to access doors. Replace the double full-lite vestibule doors with like-for-like doors and code-compliant hardware. No card access is required. Restore affected areas. Follow Attachment 5 for automatic operator and push-button requirements. Main Building/Main Level/North-Side Entry Vestibule Door Inside the vestibule on the north side a single‑leaf full-lite door with a metal frame exists. This is not used as a daily exit door but needs to function as an emergency exit as required. No key card is necessary to access door. Replace the single full-lite door with a like-for-like assembly and code-compliant emergency-egress hardware. No card access is required. Restore affected areas. Main Building/Main Level/South‑West Elevation Door (See Reference Photo 4) A small concrete exterior stairway along the south‑west elevation leads up to a single full-lite door, with a metal frame, and a solid panel above the door. This door is accessed by card. Replace the single full-lite door and integrate hardware with the existing card reader/security system. Restore affected areas. Main Building/Main Level/East Elevation Door (See Reference Photo 5) A single‑leaf glazed metal‑framed door is located along the east elevation. This door is accessed by card. Replace the single full-lite door and integrate hardware with the existing card reader/security system. Improve seals to reduce pest entry. Restore affected areas.