EDR
Updated
A PDF document (93 KB) attached to C-5 Brake Hydraulic, from the Defense Logistics Agency. Due Nov 13, 2026, 11:59 PM (UTC-7).
File name: EDR.pdf
The full file is for paid members, or buy this bid alone.
Preview
REV:
ENGINEERING DATA REQUIREMENTS/INSTRUCTIONS
(ATTACHMENT ‘A’)
NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.
1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:
BRAKE HYDRAULIC (C-5 AIRCRAFT)
2. PART NUMBER:
3. NATIONAL STOCK NUMBER:
42252E220
1620-00-122-0474
4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC. WILL BE USED IN LIEU OF THE DATA INDICATED. THE SUPERSEEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.
5. MATERIAL REVIEW BOARD:
A. OO-ALC LANDING GEAR ENGINEERING RETAINS ALL RIGHTS TO REVIEW AND ACCEPT MATERIAL REVIEW BOARD (MRB’S) DISPOSITIONS OF DISCREPANT ITEMS. ALL DEVIATIONS, MINOR (CLASS II) AND MAJOR (CLASS I), FROM THE ENGINEERING DRAWING PACKAGE SHALL BE SUBMITTED TO THE PROCURING ACTIVITY. ALL MAJOR CHANGES SHALL REQUIRE APPROVAL OF THE PROCURING ACTIVITY PRIOR TO SHIPMENT. ALL MINOR CHANGES SHALL REQUIRE COURTESY COPY TO THE PROCURING ACTIVITY AT THE TIME OF SHIPMENT. THE PROCURING ACTIVITY SHALL HAVE FINAL AUTHORITY TO DETERMINE CHANGE CLASSIFICATIONS AS MAJOR/MINOR IF THERE IS A DISAGREEMENT WITH THE SUPPLIER ASSIGNED CLASSIFICATION. A MAJOR CHANGE IS DEFINED AS ANY CHANGE THAT MAY AFFECT THE FORM, FIT, OR FUNCTION OF THE COMPONENT OR ASSEMBLY. IF THE SUPPLIER OR DCMA INSPECTORS ARE UNSURE IF THE CHANGE SHOULD BE CLASSIFIED AS MAJOR/MINOR, THE DEVIATION/WAIVER SHALL BE SUBMITTED TO THE PROCURING ACTIVITY FOR DISPOSITION. B. PRIOR TO CONTRACT AWARD, THE CONTRACTOR SHALL CERTIFY TO THE GOVERNMENT IN WRITING FULL COMPLIANCE WITH MANUALS, SPECIFICATIONS AND STANDARDS CALLED OUT AND REQUIRED FOR THE MANUFACTURE OF THIS CONTRACTED LANDING GEAR COMPONENT/ASSEMBLY. CONTRACTOR IS RESPONSIBLE TO COMPLETELY SEARCH THESE MANUALS, SPECIFICATIONS AND STANDARDS AND FULLY UNDERSTAND THE REQUIREMENTS NECESSARY TO MANUFACTURE LANDING GEAR COMPONENTS. ANY QUESTIONS CAN BE FORWARDED TO OO-ALC LANDING GEAR ENGINEERING.
6. MARKING AND UNIQUE IDENTIFICATION (UID) TO MEET DRAWING REQUIREMENTS PER MIL-STD-130 IN LIEU OF CONTRACTOR SPECIFICATION.
A. TESA TAPE LABEL APPLIED DIRECTLY TO PART AND HRI ETCHED DIRECTLY ON PART: UNIQUE IDENTIFICATION (UID) SHALL BE APPLIED TO EACH PART PER MIL-STD-130. THE UID SHALL CONTAIN HUMAN-READABLE INFORMATION (HRI) AND MACHINE-READABLE INFORMATION (MRI) MARKINGS. QUALITY AND TECHNICAL REQUIREMENTS FOR BOTH THE MRI AND HRI SHALL BE IN ACCORDANCE WITH SAE AS9132. THE METHOD OF MARKING FOR THE HRI SHALL BE LIMITED TO ELECTRO-CHEMICAL ETCHING, DOT PEEN, VIBRO PEEN, OR MICROMILL. THE DEPTH OF EACH MARK SHALL BE FROM .003 - .005 INCHES. THE HRI MARK SHALL INCLUDE BOTH THE
The beginning of the document. Download the full file to read on.