Rubric for HTME Turnkey Review
Published: 6 March 2026
Purpose: this document delineates allowable and disallowed work items in turnkey installation projects of high-
tech medical equipment (HTME). All HTME turnkey statements of work (SOWs) are assessed against this document to determine segregable and non-segregable work. The SOW evaluation is led by the Equipment Lifecycle Management office (ELCM) in collaboration with other pertinent subject matter experts. Results of the evaluation are provided to the assigned EPO AS7 contracting officer. The language contained within this document was formulated within the confines of the VA/DLA HTME contracts awarded against Solicitation No. SPE2D1-15-R-0001, section XIV. EXTENDED AND TURNKEY INSTALLATION REQUIREMENTS.
Definitions:
-
-
-
Non-segregable: The construction work is so merged with the non-construction work or so fragmented in terms of the locations or time spans in which it is to be performed, that it is not capable of being segregated as a separate contractual requirement. [FAR 22.402(b)(2)(ii)] Segregable: Such construction work is physically and functionally separate from and, as a practical matter, is capable of being performed on a segregated basis from the other work required by the contract. [FAR 22.402(b)(1)(iii)]
Equipment suite 1 – existing room(s) wherein the new system will be installed; the entirety of the suite may include the following:
1. Exam room: room where the primary imaging machine is located 2. Control room: room where computer workstations or other control stations are located 3. Equipment room: room where ancillary components and sub-systems are installed
4. MRI Zone 3 ante room
5. Linear Accelerator: treatment vault space and designated area where control equipment is located
**Spaces surrounding the equipment suite are excluded from the suite unless specifically listed above. The following spaces are not part of the suite: patient uptake rooms, restrooms, changing rooms, waiting rooms, offices, corridors, closets, etc.**
-
Sub-rooms – smaller partitioned rooms within the equipment suite dedicated to different uses (e.g., exam room, equipment room, control room, anteroom)
Interior walls – half walls, pony walls, glass partitioned walls, full walls, etc. within the equipment suite that divide the suite into sub-rooms
Exterior walls – existing walls that constitute the boundary edge of the equipment suite
The following criteria render the SOW as SEGREGABLE:
-
-
Repurposing facility space, such as: