Home / W50NH9-27-R-A006 (formally W50NH9-26-R-A019) Scalable… / Document

Exhibit A Contract Data Requirements List Contract Data Requirements List

Updated

A PDF document (522 KB) attached to W50NH9-27-R-A006 (formally W50NH9-26-R-A019) Scalable Geospatial Intelligence (GEOINT) Architecture Information Technology (IT) Contractor Manpower Equivalent (CME) Support (Scalable GEOINT), from the Department of the Army. Due Nov 13, 2026, 12:00 PM (UTC-5).

File name: Exhibit_A___Contract_Data_Requirements_List__CDRL____14_OCT_2026_.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.
0005, 1005, 2005, 3005, 4005, 5005

A

D. SYSTEM/ITEM

Scalable GEOINT Architecture
1. DATA ITEM NO.

A001

C. CATEGORY:

B. EXHIBIT

8. APP CODE

F. CONTRACTOR

TBD

3. SUBTITLE

Critical Characteristics Control Plan (CCCP)

Quality Control Plan (QCP)

5. CONTRACT REFERENCE

DI-MGMT-81986

N/A

OTHER

TM

2. TITLE OF DATA ITEM

4. AUTHORITY (Data Acquisition Document No.)

7. DD 250 REQ

TDP

E. CONTRACT/PR NO.

W50NH9-27-R-A006

10. FREQUENCY

B

11. AS OF DATE

NSP

6. REQUIRING OFFICE

PWS C.1.8.2.4, C.1.9.4, C.1.9.4.3

9. DIST STATEMENT

REQUIRED

N/A

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G3 Army GEOINT Office

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

As Required
See BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

See BLK 16

16. REMARKS

BLOCK 4: For reference only. The report shall be prepared according to the remarks below. BLOCK 11: Upon award of Contract
BLOCK 12: Within 30 calendar days from award of Contract BLOCK 13: As Requested

0.00

b. COPIES

As Required
Draft

Final
Reg

COR

KO

TTM

CS

15.TOTAL

Repro

Format: The Quality Control Plan (QCP) shall be in the contractor's format and approved by the government, unless otherwise specified. Report shall be in electronic/digital format (Microsoft Word, Microsoft Excel, and or Adobe PDF).
Remarks: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which it assures itself that his work complies with the requirement of the PWS. The Contractor is responsible for the management and quality control actions necessary to meet the quality standards set forth in the contract. The Contractor is responsible for the submission of a Quality Control Plan (QCP) to be used as a guide and to rigorously document the implementation of the required management, quality assurance, and quality control actions to achieve the specified results. As part of the QCP, the Contractor shall identify and document any individual CMEs whose performance falls below the standards prescribed in the Performance Work Statement (PWS). The Contractor shall prepare and submit a corrective action plan, including specific remedial measures and an implementation timeline, and shall provide written reports detailing subsequent compliance, improvement, or continued

The beginning of the document. Download the full file to read on.

Other documents in this bid