TECHNICAL REQUIREMENTS

Mounted Family of Computer Systems (MFoCS) Block II Line Replaceable Units (LRU) For
Joint Battle Command – Platform (JBC-P)

Exhibit A
Issue: 07/09/2026

PANAPG-26-P-0000 036818

APPLICABLE DOCUMENTS

Commented [ZP1]: Will update table at the end

Military and Federal Standards

MIL-STD-129R(3)

MIL-STD-810H

MIL-STD-2073-1E(4) Not 1

Military Marking for Shipment and Storage (25 Feb 2023) Environmental Engineering Considerations and Laboratory Tests Standard Practice for Military Packaging (27 Jun 2024)

Military and Federal
Specifications

MIL-E-5400

MIL-HDBK-61A

General Spec for Electronic Equipment, Aerospace
Configuration Management Guidance (Dated 7 Feb 2001)

Other Documents

PMMC-MFOCSII-0001_V1.1

ISPM 15

MFoCS Block II Performance Spec
Regulation of Wood Packaging Material in International Trade (1 Apr 2009)

Commercial Documents

SAE EIA-649-1

Configuration Management Requirements for Defense Contracts

Security Documents
AR 381-12

Counterintelligence Awareness and Reporting

CONFIGURATION BASELINE

The applicable Configuration Baselines (CB), for the listed Configuration Item (CI) and/or Computer Software Configuration Item (CSCI), are as listed in the table below. NSN
7025-01-623-5349
7021-01-718-8614
7021-01-737-4372
7025-01-675-8118
7025-01-677-7680
7035-01-675-7998

Nomenclature

KEYBOARD, DATA ENTRY

COMPUTER, DIGITAL (Block II V2 w/ MGUE)

COMPUTER, DIGITAL

DISPLAY UNIT (Block II)

DISPLAY UNIT

DOCKING STATION

Part Numbers/Drawings
9800-96830-0000
9800-98600-6000
9800-98000-6000
9800-99120-0000
9800-99210-0000
9800-99300-5000

Commented [MT2]: -5349: SSPCL indicates 9800-96810-0000. Commented [ZP3R2]: 96810 has been replaced by 96830

Each CI/CSCI, as developed/built and delivered, shall conform to the cited CB and (if applicable) all subsequent CB’s that will be made contractually binding by the Procuring Contracting Officer (PCO). The Contractor shall establish a Configuration Management Program in accordance with SAE EIA-649-1. No changes or departures from the CB are acceptable except for changes or departures which are submitted in accordance with EIA-649-1, CDRL A001, and CDRL B001, and are approved by the Government Configuration Manager (C Mgr.) or Configuration Management Officer (CMO) and which are made applicable to the contract by the PCO.
An Engineering Change Proposal (ECP) describes the changes to be made to the CI/CSCI and all associated Government documents and data that are affected by the proposed engineering change. An ECP should be