Exhibit F 1364 Global ProposaltoLeaseSpace Form 1364 10 17NEW
Updated
A PDF document (304 KB) attached to 36C24626R0073 Fredericksburg, VA RLP RFI Answers, from the Department of Veterans Affairs. Due Nov 13, 2026, 5:00 PM (UTC-5).
File name: S02 - Exhibit F 1364 Global_ProposaltoLeaseSpace_Form 1364_10_17NEW.pdf
The full file is for paid members, or buy this bid alone.
Preview
In Response to Request for Lease
Proposals (RLP) Number
PROPOSAL TO LEASE SPACE
36C24724R0011
MM-DDYYYY
DATED
SECTION I - DESCRIPTION OF PREMISES
1. BUILDING
DESCRIPTION
b. Building Street Address
a. Building Name
XXXXX
XXXXX
c. City
d. State
e. 9-Digit ZIP Code
XX
XXXXX-XXXX
XXXXX
2a. FLOORS OFFERED
2b. TOTAL NUMBER
OF FLOORS IN BUILDING
4. LIVE FLOOR LOAD
Congressional District
3. TOTAL RENTABLE SPACE IN OFFERED BUILDING
5. MEASUREMENT
METHOD
Pounds per SF
f.
a. GENERAL PURPOSE
(Office)
SF
b. WAREHOUSE
c. OTHER
6. YEAR OF LAST
MAJOR RENOVATION
(if applicable)
7. BUILDING AGE
SF
SF
8. SITE SIZE
ANSI/BOMA
SF
OTHER
Acres
SECTION II - SPACE OFFERED AND RATES
9.
_ 20,492
ANSI/BOMA OFFICE AREA
SQUARE FEET (ABOA)
_23,521
10. RENTABLE SQUARE FEET
(RSF)
_
11. COMMON AREA FACTOR (CAF)
“Tenant Improvements” are all alterations for the Government-demised area above the building shell buildout, excluding costs identified as tenant improvements in the Security Unit Price List. Building Specific Amortized Capital (BSAC) is the sum of costs identified as such in the Security Unit Price List. Neither the Tenant Improvements as stated in Block 12, nor the BSAC as stated in Block 13, are to be included in the shell rent. It is expected that the tenant buildout will be fully amortized at the end of the firm term, and the rent will be reduced accordingly. Any desired rent increases or decreases beyond the firm term of the lease should be reflected in the shell rate and fully explained as part of this written proposal. If Tenant Improvements or BSAC improvements are to be amortized beyond the firm term, those calculations must be itemized as part of this written proposal. The Offeror may attach additional pages as necessary.
Number of years each cost per square foot
is in effect. State any changes for any rent
component.
a.
b.
c.
d.
e.
f.
BUILD-OUT COSTS PER
CATEGORY
AMORTIZATION
TERM
AMORTIZATION
INTEREST RATE
(%)
ANNUAL RENT
ANNUAL RENT
$ PER RSF
$ PER ABOA SF
NUMBER YEARS
RATE IS
EFFECTIVE
12. TENANT IMPROVEMENTS
(per RLP requirements)
$
_
_
$
$
_
13. BSAC
(per RLP requirements)
$
_
_
$
$
_
14. SHELL BUILD-OUT
(per RLP requirements)
$
16. SHELL RENT (Including real
estate taxes. Refer to Line 28 on
GSA Form 1217)
$
$
_
17. OPERATING COSTS (Refer to
Line 27 on GSA Form 1217)
$
$
18. TOTAL RATE/SF
$
$
15. TOTAL BUILD-OUT COSTS
$
19. TOTAL ANNUAL RENT
$
PER SF RATE
$
20. STEP RENT (SHELL RATES)
$
21. PARKING
a.
b.
c.
d.
_
PER SF RATE
FOR YEARS
_/RSF
_/ABOA
$
Thru
_
FOR YEARS
/RSF
PER SF RATE
FOR YEARS
$
_/RSF
$
_/ABOA
Thru
$
/ABOA
Number of parking spaces for the entire building/ facility which are under the control of the Offeror:
The beginning of the document. Download the full file to read on.