Home / 36C24626R0073 Fredericksburg, VA RLP RFI Answers / Document

Exhibit F 1364 Global ProposaltoLeaseSpace Form 1364 10 17NEW

Updated

A PDF document (304 KB) attached to 36C24626R0073 Fredericksburg, VA RLP RFI Answers, from the Department of Veterans Affairs. Due Nov 13, 2026, 5:00 PM (UTC-5).

File name: S02 - Exhibit F 1364 Global_ProposaltoLeaseSpace_Form 1364_10_17NEW.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

In Response to Request for Lease
Proposals (RLP) Number

PROPOSAL TO LEASE SPACE

36C24724R0011

MM-DDYYYY

DATED

SECTION I - DESCRIPTION OF PREMISES

1. BUILDING

DESCRIPTION

b. Building Street Address

a. Building Name

XXXXX

XXXXX

c. City

d. State

e. 9-Digit ZIP Code

XX

XXXXX-XXXX

XXXXX

2a. FLOORS OFFERED

2b. TOTAL NUMBER

OF FLOORS IN BUILDING

4. LIVE FLOOR LOAD

Congressional District

3. TOTAL RENTABLE SPACE IN OFFERED BUILDING

5. MEASUREMENT

METHOD

Pounds per SF

f.

a. GENERAL PURPOSE

(Office)
SF

b. WAREHOUSE

c. OTHER

6. YEAR OF LAST

MAJOR RENOVATION

(if applicable)

7. BUILDING AGE

SF

SF

8. SITE SIZE

ANSI/BOMA

SF

OTHER

Acres

SECTION II - SPACE OFFERED AND RATES

9.

_ 20,492

ANSI/BOMA OFFICE AREA

SQUARE FEET (ABOA)

_23,521

10. RENTABLE SQUARE FEET

(RSF)

_

11. COMMON AREA FACTOR (CAF)

“Tenant Improvements” are all alterations for the Government-demised area above the building shell buildout, excluding costs identified as tenant improvements in the Security Unit Price List. Building Specific Amortized Capital (BSAC) is the sum of costs identified as such in the Security Unit Price List. Neither the Tenant Improvements as stated in Block 12, nor the BSAC as stated in Block 13, are to be included in the shell rent. It is expected that the tenant buildout will be fully amortized at the end of the firm term, and the rent will be reduced accordingly. Any desired rent increases or decreases beyond the firm term of the lease should be reflected in the shell rate and fully explained as part of this written proposal. If Tenant Improvements or BSAC improvements are to be amortized beyond the firm term, those calculations must be itemized as part of this written proposal. The Offeror may attach additional pages as necessary.
Number of years each cost per square foot
is in effect. State any changes for any rent
component.
a.

b.

c.

d.

e.

f.

BUILD-OUT COSTS PER

CATEGORY

AMORTIZATION

TERM

AMORTIZATION

INTEREST RATE

(%)

ANNUAL RENT

ANNUAL RENT

$ PER RSF

$ PER ABOA SF

NUMBER YEARS

RATE IS

EFFECTIVE

12. TENANT IMPROVEMENTS

(per RLP requirements)

$

_

_

$

$

_

13. BSAC

(per RLP requirements)

$

_

_

$

$

_

14. SHELL BUILD-OUT

(per RLP requirements)

$

16. SHELL RENT (Including real

estate taxes. Refer to Line 28 on
GSA Form 1217)

$

$

_

17. OPERATING COSTS (Refer to

Line 27 on GSA Form 1217)

$

$

18. TOTAL RATE/SF

$

$

15. TOTAL BUILD-OUT COSTS

$

19. TOTAL ANNUAL RENT

$

PER SF RATE

$

20. STEP RENT (SHELL RATES)

$

21. PARKING

a.
b.
c.
d.

_

PER SF RATE

FOR YEARS

_/RSF

_/ABOA

$
Thru

_

FOR YEARS

/RSF

PER SF RATE

FOR YEARS

$

_/RSF

$

_/ABOA

Thru
$

/ABOA

Number of parking spaces for the entire building/ facility which are under the control of the Offeror:

The beginning of the document. Download the full file to read on.

Other documents in this bid