FA requirements
Updated
A PDF document (113 KB) attached to Power Supply Assembly, from the Department of the Air Force. Due Dec 10, 2026, 4:30 PM (UTC-7).
File name: FA requirements.pdf
The full file is for paid members, or buy this bid alone.
Preview
1. DATE
FIRST ARTICLE REQUIREMENTS
18 AUG 2026
(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)
2. PR / MIPR NUMBER
3. CAGE / REFERENCE NUMBER
4. NSN
23991 / 47C530433G1
1190012440693NP
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 1
UNIT(S) OF LOT / ITEM Item
AND WILL BE: X PART OF PRODUCTION QUANTITY
IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL
7. LONG LEAD TIME ITEMS
X WILL NOT
SERVE AS A MANUFACTURING STANDARD
REQUIRED
X NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED
NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A.
CONTRACTOR TESTING
X GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are in drawing 47C530433 and all sub-tier engineering documents with emphasis on Overall Configuration, No Damage, Complete Certs Package, Complete Performance Inspection Report, Correct Markings and Correct Packaging. Also provide FA to 414th engineering for checkout/dry-fit.
B. The detailed technical requirements for First Article approval tests are contained in drawing 47C530433 and all sub-tier engineering documents with emphasis on Overall Configuration, No Damage, Complete Certs Package, Complete Performance Inspection Report, Correct Markings and Correct Packaging. Also provide FA to 414th engineering for checkout/dry-fit. (Cite Spec and Para number)
C.
TEST PLAN REQUIRED
(1) DD Form 1423 ELIN
(2) Delivery due
calendar days from date of contract.
(3) Number of days for government approval / disapproval
days.
D. Contractor's notification to ACO and
(Requesting Activity)
of test time and location due
E.
days prior to start of testing.
X TEST REPORT REQUIRED
(1) DD Form 1423 ELIN Included with PR, A001
(2) Due 120
calendar days from date contract.
(3) Forwarded to
809 MXSS/MXDEB (DODAAC: FB2029)
Bldg 849, Attn: Non-Account
Mark for: First Article Do Not Post
Hill AFB, UT 84056-5713
(4) Government written notice of approval / disapproval due 120
days after receipt of contractor's report.
AFMC IMT 260, 20230316, V-5, PREVIOUS EDITION IS OBSOLETE
The beginning of the document. Download the full file to read on.