Home / SBS005523 Short Term Services / Document

FOE Redacted

Updated

A PDF document (2.1 MB) attached to SBS005523 Short Term Services, from the Department of the Air Force.

File name: PA-2208 FOE SBS005523 Redacted.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction Instructions for Completing the Template
(2) State whether the action is a new order or a modification to an existing order. Identify the basic multiple award contract number and the order number for the current action. Also identify the type of the order/line items on the order (e.g., Firm Fixed price, Cost Plus Fixed Fee, etc.). (3) Specifically describe the supplies/services to be acquired including the price/cost and quantity of each item in the order and the total estimated value of the order. For services, state whether services are performance-based, and if not, provide rationale for not being performance based. State the delivery/performance schedule/period for the items under the order. Explain how the requirement/order fits under the scope of the basic multiple award contracts. (Note: The Contracting Officer must ensure that the order is issued within the period of performance and within the maximum value of the contract).
(4) Include the appropriate exception from RFO 16.507-6(b) and the supporting rationale. RFO 16.507-2(a) requires the Contracting Officer to provide each awardee under a multiple award contract, a fair opportunity to be considered for each order exceeding the micro-purchase threshold unless a statutory exception applies. If a brand name product description is being justified, use this section to explain why the particular brand name, product, or feature is essential to the Government's requirements and why other companies' similar products/services do not meet, or cannot be modified to meet, the agency's needs.
RFO 16.507-6(b)(1): “The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays”. When using this exception provide a detailed justification with supporting documentation that explains the exact urgency of the requirement and the mission impact if awarded to any other contractor. The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements of urgency are not acceptable. RFO 16.507-6(b)(2): “Only one awardee is capable of providing the supplies or services required at the level at the level of quality required because the supplies or services ordered are unique or highly specialized”. When using this exception provide a detailed justification, with supporting documentation, as evidence of the “unique or highly

The beginning of the document. Download the full file to read on.