Foundry Sand Contract Statement of Work updated (003)
Updated
A PDF document (182 KB) attached to Bulk Foundry Sand, from the Department of the Army. Due Oct 28, 2026, 6:00 PM (UTC-5).
File name: Foundry Sand Contract SOW updated (003).pdf
The full file is for paid members, or buy this bid alone.
Preview
ROCK ISLAND ARSENAL
SCOPE OF WORK
DATE: 16 March 2026
BULK SAND FOR THE FOUNDRY
1. GENERAL
* This requirement is for the purchase, delivery of BadgerCast FW80 sand to B212 Foundry.
2. SUPPLY BULK SAND
*
The vendor shall be responsible for delivering BadgerCast FW80. The sand shall have typical chemical and physical properties as shown below.
FW80
Typical Screen
Analysis
Typical Chemical Analysis
Sieve
% Retained
Silicon Dioxide (SiO2)
99.70%
#20
Aluminum Oxide (Al2O3)
0.13%
#30
Iron Oxide (Fe2O3)
0.06%
#40
0.2
Potassium Oxide
0.08%
#50
2.1
Calcium Oxide (CaO)
0.02%
#70
18.4
Magnesium Oxide (MgO)
<0.001%
#100
44.1
Sodium Oxide (Na2O)
<0.001%
#140
28.3
Titanium Dioxide (TiO2)
<0.001%
#200
6.1
#270
.9
Pan
pH
7.0
GFN
79.5
ADV
.5
Typical Values
Loss on Ignition (LOI)
0.083%
The vendor shall supply a certification of analysis with each shipment. The certification of analysis must contain Sieve Analysis results, GFN and Acid Demand Value. Vendor shall supply a small sample of sand that is representative of the sand being delivered for internal JMTC testing.
3. SAND DELIVERY
The vendor will deliver bulk sand using truck with a bulk pneumatic blower to blow the sand into the sand storage hopper. The sand will be pumped in from both the south and north side of building 212 Foundry. Normal deliveries will be pumped in from the south side of building 212. Deliveries to the north side of building 212 will be to fill storage hopper. Each deliver should be within plus/minus 10% of the ordered quantity. Sand system holds 45 tons of sand and the storage hopper holds 25 ton Estimated annual usage is 1875 tons.
ROCK ISLAND ARSENAL
SCOPE OF WORK
DATE: 16 March 2026
Annual usage based off current workload. There will be 3 truckloads to fill the system at the start. 2 truckloads for the sand system then 1 truck load for the storage hopper. From that point on we will need I truckload a week. RIA-JMTC reserves the right to contact supplier for additional sand deliveries if needed. Vendor must invoice based off certified Weight Tickets.
4.SAFETY
When services are performed onsite the vendor is responsible for complying with all federal, state, and local safety and environmental regulations, including, but not limited to Rock Island Arsenal, Department of the Army (DA), Occupational Safety and Health Act, Environmental Protection Agency (EPA), Illinois Environmental Protection Agency (IEPA). Vendor must adhere to all Rock Island Arsenal Safety requirements, policies and statutes.
5. SECURITY: Security training (not needing a CAC)
Access and General Protection/Security Policy and Procedures.
The beginning of the document. Download the full file to read on.