FP14SupplementalSpecs ChampionPitCrushing
Updated
A PDF document (341 KB) attached to Champion Creek Pit Rock Crushing Supply, from the Forest Service. Due Nov 5, 2026, 5:00 PM (UTC-7).
File name: C04b_FP14SupplementalSpecs_ChampionPitCrushing_1240LT27Q0008.pdf
The full file is for paid members, or buy this bid alone.
Preview
Forest Service Supplemental Specifications
Champion Creek Pit Rock Crushing
Forest Service Supplemental Specifications
Champion Creek Pit Rock Crushing
Preface
Preface_wo_3_15_2022
Delete all but the first paragraph and add the following: The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.
Forest Service Supplemental Specifications
Champion Creek Pit Rock Crushing
101 – Terms, Format, and Definitions
101.01_national_11_09_2016
101.01 Meaning of Terms.
Add the following:
Delete all references in FP-14 to Transportation Acquisition Regulations (TAR). 101.03_national_11_09_2016
101.03 Abbreviations.
Add the following to (a) Acronyms:
.
AGAR
AFPA
FSAR
MSHA
NESC
WCLIB
Agriculture Acquisition Regulations
American Forest and Paper Association
Forest Service Acquisition Regulations
Mine Safety and Health Administration
National Electrical Safety Code
West Coast Lumber Inspection Bureau
Add the following new subpart (f):
(f) Miscellaneous unit abbreviations.
MP
milepost
(location)
ppm
parts per million
(volume)
STA
Station
(location)
101.04_forest_3_28_2025
101.04 Definitions.
Delete the following definitions and replace with the following: Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
Forest Service Supplemental Specifications
Champion Creek Pit Rock Crushing
Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure. Plans — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Plans for Construction. Also refers to submissions and submittals. Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.
Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse
The beginning of the document. Download the full file to read on.