Part 2
Point Mugu General Requirements
Note: Part 2 contains the Basic form of the General Requirements. Project-specific, geographic and facilityspecific requirements are issued with individual Orders as Part 2, Attachment A, or alternatively referred to as Part 2A. Paragraph numbers correspond between Part 2 and Part 2A.

1.

DEFINITIONS: As used throughout the agreement, the following terms shall have the meaning set forth below:
The terms “contract” and “Order” are synonymous.
Contracting Officer (KO): The individual designated to administer the Order. Throughout the duration of the project, this individual will be responsible and possess the authority to act on behalf of the Government with respect to the specific Order.
Contracting Officer Representative (COR): The individual designated by the Contracting Officer as the authorized representative of the Contracting Officer. The COR is responsible for monitoring performance and technical management of the effort required and should be contacted regarding questions or problems of a technical nature.
Contractor: The term Contractor refers to both the prime Contractor and subcontractors. Quality Control (QC): Contractor’s system to control the quality of material, equipment and construction. Quality Assurance (QA) Program: Government’s program to evaluate the effectiveness of the Contractor’s quality control. The Government’s QA Program is not a substitute for the Contractor’s QC Program. Federal Holidays: New Year’s Day, Martin Luther King Jr. Day, President’s Day, Memorial Day, Independence Day; Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day.

2.

ORDER OF PRECEDENCE: In the event of conflict or inconsistency between any of the below described portions of the agreement, precedence shall be given in the following order:

a.

Any portions of the proposal that exceed the requirements of the Order.

b.

The requirements of the Order, in descending order of precedence: 1) RFQ Form, Form DD1155, and Davis Bacon wage rates.
2) Part 1 – Order Clauses.
3) Part 2 – Attachment A.
4) Part 2 – General Requirements.
5) Part 3 – Statement of Work/Project Program Requirements. 6) Part 6 – Attachments.
7) Part 5 – Prescriptive Technical Specifications, exclusive of performance specifications. 8) Part 4 – Performance Technical Specifications, exclusive of prescriptive specifications.

3.

DESIGN: Although design is not generally included, certain shop drawings or similar submittals may be

The beginning of the document. Download the full file to read on.