PERFORMANCE WORK STATEMENT (PWS)
Portal Crane Wire Rope Replacement
PART 1
GENERAL INFORMATION
1. GENERAL: This is a non-personal services contract to conduct replacement of wire rope on seven (7) portal cranes at Puget Sound Naval Shipyard. The Government shall not exercise direct supervision or control over any contractor employees. Notwithstanding, contractor shall ensure employees comply with all requirements of this Performance Work Statement (PWS) and contract. 1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and any other items necessary to perform a nonpersonal service for replacement of wire rope as defined in this Performance Work Statement. The contractor shall perform to the standards in this contract. 1.2 Background: The specified cranes (referred to throughout this document as “the crane”) are travelling luffing boom portal cranes at Puget Sound Naval Shipyard (PSNS) indicated in Attachment 1. The ropes specified for replacement either have already reached rejection criteria or are anticipated to reach rejection criteria in the near future per Government inspection to NAVFAC P-307 criteria. Due to the difficulty of properly inspecting many of the other reeving components while wire rope is installed, the Government also desires to inspect these components after the removal of wire rope to evaluate them for future replacement.
1.3 Objectives: Contractor to replace all specified wire ropes with new wire rope meeting the listed requirements.
1.4 Scope: Replace all wire ropes while conforming to all listed requirements with respect to the replacement parts and conducted work.
1.5 Period of Performance: Date of award through 36 months to begin on or around June 1, 2027. The onsite dates shall be agreed upon by the Government and the contractor within the Period of Performance (POP) window.
Base Year:
1 June 2027 to 31 May 2028
Option Year 1:
1 June 2028 to 31 May 2029
Option Year 2:
1 June 2029 to 31 May 2030
1.6 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the