Government Responses to RFC 001-003
Updated
A PDF document (68 KB) attached to Maintenance, Repair, and Preservation of YRBM-50, from the Department of the Navy. Due Nov 2, 2026, 12:00 PM (UTC-8).
File name: C3 N4523A26R1002 Government Responses to RFC 001-003.pdf
The full file is for paid members, or buy this bid alone.
Preview
Government Response to RFC 001-003 N4523A26R1002
001)
Question:
After performing the shipcheck, it is noted that there are 2ea chill boxes that will need to be removed to accomplish the requirements of section 3.5 of the SOW.
Could you please provide directions on how to proceed with this discrepancy. Response:
The exterior chill boxes located on the aft end of the vessel closely affixed to the deckhouse at approximately FR 68 as depicted in drawing 8994840 Rev A will remain in place and will not be painted. These chill boxes will be protected per the SOW throughout the availability. Mask and protect the boxes to prevent adhesion of coatings. Preservation work called out in sections 3.5 and 3.6 will occur around the chill boxes with a 2-inch border between the new paint and the existing chill boxes. 002)
Question:
Can the Navy Supply the following drawings that weren’t supplied? For Item 3.3.2 – 631347
For Item 3.13 – 113-5293092 Rev D
For Item 3.17 – 113-7583701
Can the Navy supply an updated Booklet of General Plans YRBM-50 Drawing? The 845-8275822 drawing supplied is inaccurate on actual spaces, locations and space numbering to the new drawings for Items, and especially for Items 3.6.2, 3.6.5, 3.13.1, 3.14.1, 3.15.1, 3.16.1, 3.17.1, 3.18.1. Is there a newer drawing or a marked up updated drawing that is more accurate of what the barge layout of spaces and structures are currently with updated compartment and passageway numbers? Response:
The SOW citation of drawing 113-5293092 Rev D listed in section 3.13 for SHIPALT YRBM-1134D was cited in error. The relevant drawing is 113-5293062 Rev D. Requested drawings 631347, 1135293062 Rev D, and 113-7583701 are included in Amendment 0002. No, we do not have an updated Booklet of General Plans YRBM-50 Drawing. Relevant and available drawings for ship alteration and SOW work items have been provided for comprehensive reference. 003)
Question:
Can the Navy extend the Clarification date 7 calendar days to allow the Contractor and Subcontractors more time to assemble questions to the Navy?
Can the Navy extend the Bid Due Date 7 calendar days to allow the Contractor and Subcontractors more time to assemble pricing after answers to the questions are received? Response:
See Amendment 0002. The RFC due date has been extended from 8 October 2026 at 12:00 PM PT to 15 October 2026 at 12:00 PM PT and the proposal due date from 19 October 2026 at 12:00 PM PT to 26 October 2026 at 12:00 PM PT
The beginning of the document. Download the full file to read on.