IA Form C113 Progress Schedule
Updated
A PDF document (206 KB) attached to Tohaali School REPAINT EXTERIOR WALLS BLDG. 102, from the Bureau of Indian Affairs. Due Dec 14, 2026, 5:00 PM (UTC-7).
File name: A7_IA_Form_C113_Progress_Schedule.pdf
The full file is for paid members, or buy this bid alone.
Preview
Department of the Interior, Indian Affairs
CONTRACT PROGRESS SCHEDULE
(See Contractor's Instructions on Reverse)
1. CONTRACT NO.
8. PROJECT TITLE
10. APPROVAL RECOMMENDED BY:
DATE SIGNED
PROJECT ENGINEER / COR SIGNATURE
2. STARTING DATE
3. COMPLETION DATE
9. SUBMITTED BY:
4. PURCHASE REQUEST NO.
DATE SIGNED CONTRACTOR'S NAME (Last, First, Middle Initial) ADDRESS (Street, City, State, Zip Code)
5. PROJECT NO.
CONTRACTOR'S SIGNATURE 11. APPROVED BY:
DATE
CONTRACTING OFFICER'S SIGNATURE
6. ACTUAL STARTING DATE
7. ACTUAL COMPLETION
LINE
NO
A
WORK ELEMENTS
B
FORM IA-C113
%
C
WEEKS
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
INSTRUCTIONS TO CONTRACTORS
1. Prepare three copies of this form IA-C113, in accordance with these instructions, and submit to the contracting officer at the time stated in the contract or as established by the contracting officer. 2. Blocks 1, 2, and 3. Enter the contract number, starting date, and completion date as shown on the contract. 3. Block 8. Enter the title of the project as shown on the contract. 4. Block 9. Enter name and address of your firm. The three copies submitted to the contracting officer must be dated and signed by the contractor or an authorized representative of the firm. 5. Lines 1 through 12. Major elements of work (whether unit price or lump sum contract) such as excavation, concrete work, carpentry, engineering, installation of communication electronic facilities, etc., will be shown in Column B in logical sequence and in sufficient detail to identify the element. If the contract calls for more than 11 work elements, additional copies of this may be used as a continuation for the work elements.
6. The percentage of each listed work element to the complete job will be shown opposite each element in Column C. As an example, if 3 work elements are shown: excavation, concrete work, and backfill, and it is estimated that excavation is 50% of the total job, concrete 30%, and backfill 20%, these percentages will be shown opposite each element. The total must equal 100%. 7. Columns D through Q will be used to show planned periodic progress, as required by the contracting officer, during the period of the contract. Only the top half of the space under these columns will be used by contractors. Using the example cited above and assuming that the contract period for performance is 8 weeks, and it is planned to accomplish 10% of the excavation work the 1st week and 20%each week until excavation is complete, 10 would be shown in the upper half of Line 1 under Column D, 20 under Column E, and 20 under Column F for a total of 50%. If it is planned to accomplish the concrete
The beginning of the document. Download the full file to read on.