ICT Performance Work Statement Reacquisition MRAS
Updated
A PDF document (178 KB) attached to Industrial Control Technician, from the Department of the Air Force. Due Oct 28, 2026, 11:00 AM (UTC-6).
File name: ICT PWS Reacquisition 29 Sep 26_MRAS.pdf
The full file is for paid members, or buy this bid alone.
Preview
PERFORMANCE WORK STATEMENT
FOR
INDUSTRIAL CONTROL TECHNICIAN (ICT)
Buckley Space Force Base (BSFB)
Date: 30 Sept 2026
Section Number and Title
Page Number
1.0 DESCRIPTION OF SERVICES
2.0 SERVICE SUMMARY
3.0 GENERAL INFORMATION
1.0. DESCRIPTION OF SERVICES:
1.1. The Contractor shall provide all work specified by this Performance Work Statement (PWS). The Contractor shall provide all personnel, personal protective equipment, and other items not provided to perform all tasks and functions for Buckley Space Force Base (BSFB) as defined in this PWS. The Contractor shall provide all managerial oversight, direction, and coordination for all functions and requirements identified in this PWS to ensure effective, efficient, and economical operation of all activities outlined. The contract objective is for the Contractor to perform service consistent with stated thresholds in the following areas:
The Contractors will provide the following services:
1.2. Industrial Control Technician (ICT)
1.2.1. The Contractor shall perform hands-on physical and device-level maintenance, configuration, and cybersecurity hardening of the field-level Operational Technology (OT) infrastructure.
1.2.2. The Contractor shall assist in identifying, analyzing, and prioritizing EMCS/Industrial Control Systems (ICS) requirements in accordance with the Requirements and Optimization process.
1.2.3. The Contractor shall provide formal assessments regarding adherence to Air Force policies and directives, specifically as they apply to the cybersecurity and management of Control Systems (CS).
1.2.4. The Contractor shall conduct and/or participate in the Control System Working Group (CSWG), in support of Space Base Delta 2.
1.2.5. The Contractor shall diagnose and repair electromechanical faults within control cabinets (PLCs, relays, I/O modules) and troubleshoot network connectivity/protocol issues at the device level (BACnet/IP, Modbus TCP/IP).
1.2.6. The Contractor shall apply configurations to implement "least privilege" principles and maintain a secure repository of field device logic backups. 1.2.7. The Contractor shall apply OEM firmware patches to mitigate vulnerabilities and change default passwords.
1.2.8. The Contractor shall ensure all control system enclosures are physically secured with locks and conduct and document quarterly physical security checks.
1.2.9. The Contractor shall physically disable unused USB and Ethernet switch ports on control devices.
1.2.10. The Contractor shall physically inventory OT assets to identify hardware, software,
The beginning of the document. Download the full file to read on.