J-1 SEA
Updated
A PDF document (392 KB) attached to 697DCK-27-R-00028: SEA Elevator Maintenance Services, from the Federal Aviation Administration. Due Dec 11, 2026, 5:00 PM (UTC-5).
File name: J-1 SEA (SOW).pdf
The full file is for paid members, or buy this bid alone.
Preview
FEDERAL AVIATION ADMINISTRATION
STATEMENT OF WORK
SEATTLE DISTRICT FACILITIES
PART 1 GENERAL
1.1 PURPOSE
A. The purpose of this Statement of Work (SOW) is to establish a firm fixed-price contract for full-service maintenance, inspection, testing, and repair services for Vertical Transportation Equipment (VTE), including elevators and related systems, at the specified locations. The Contractor shall be responsible for ensuring the equipment remains operational, code-compliant, and safe, with minimal downtime. Services must be performed in accordance with the latest editions of ASME A17.1 (Safety Code for Elevators and Escalators) and ASME A18.1 (Safety Standard for Platform Lifts and Stairway Chairlifts). Full-service maintenance shall begin upon the notice to proceed.
B. Locations of Service:
•
Seattle ATCT– 2440 S 166th St., Seattle, WA 98159
•
Seattle ASR 9 – 16824 8th PL South, SeaTac, WA 98148
•
Paine Field ATCT – 3310 100th St. SW, Everett, WA 98204
C. Equipment List
See attached Attachment A ATCT Equipment List
D. PERIOD OF PERFORMANCE: The Period of Performance shall be for one (1) Base Year & four 12-month Option Years. The Period of Performance reads as follows: •
Base Year: 01/01/2027 – 09/30/2027
•
Option Year 1: 10/01/2027 – 09/30/2028
•
Option Year 2: 10/01/2028 – 09/30/2029
•
Option Year 3: 10/01/2029 – 09/30/2030
•
Option Year 4: 10/01/2030 – 09/30/2031
1.2 HOLIDAYS
Contractor services that fall on the following federal holidays will need to be scheduled on a different day or special arrangements need to be made with the Contracting Officer Representative (COR) to ensure the point of contact needed is available. A skeleton crew of on-site FAA personnel will consist of essential safety-related positions only, on the holidays listed below:
•
•
•
•
•
•
•
•
•
•
•
New Year's Day (January 1)
Martin Luther King Jr. Day (Third Monday in January)
Presidents' Day (Third Monday in February)
Memorial Day (Last Monday in May)
Juneteenth (June 19)
Independence Day (July 4)
Labor Day (First Monday in September)
Indigenous Peoples' Day/Columbus Day (Second Monday in October) Veterans Day (November 11)
Thanksgiving Day (Fourth Thursday in November)
Christmas Day (December 25)
1.3 WORKING HOURS
A. All scheduled contract work must be accomplished during normal hours (7:00am4:30pm Monday-Friday), and the contractor must coordinate scheduled outages 24 hours prior and reaffirmed by the Contracting Officer (CO) or Contracting Officer’s
The beginning of the document. Download the full file to read on.