J-4 NAVSEA SI 009-012
Updated
A PDF document (372 KB) attached to MK 41 Vertical Launch System (VLS) Overhaul, from the Department of the Navy. Due Oct 29, 2026, 12:00 PM (UTC-4).
File name: J-4 NAVSEA SI 009-012.pdf
The full file is for paid members, or buy this bid alone.
Preview
NAVSEA
STANDARD ITEM
FY-27
ITEM NO:
009-012
DATE:
01 OCT 2024
CATEGORY:
II
1.
SCOPE:
1.1
2.
Title:
Weld, Fabricate, and Inspect; accomplish
REFERENCES:
2.1
MIL-STD-1689, Fabrication, Welding, and Inspection of Ships Structure
2.2
American Bureau of Shipping (ABS) Rules for Building and Classing Steel Vessels
2.3
0900-LP-060-4010, Fabrication, Welding, and Inspection of Metal Boat and Craft Hulls
2.4
S9074-AQ-GIB-010/248, Requirements for Welding and Brazing Procedure and Performance Qualification
2.5
0900-LP-001-7000, Fabrication and Inspection of Brazed Piping Systems
2.6
S9074-AR-GIB-010/278, Requirements for Fabrication Welding and Inspection, and Casting Inspection and Repair for Machinery, Piping, and Pressure Vessels
2.7
MIL-STD-22, Welded Joint Design
2.8
MIL-STD-2035, Nondestructive Testing Acceptance Criteria
2.9
T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods
2.10 DOD-STD-2185, Requirements for Repair and Straightening of Bronze Naval Ship Propellers
2.11 S9221-C1-GTP-010/020, Main Propulsion Boilers; Repair and Overhaul 2.12 S9AA0-AB-GOS-010, General Specifications for Overhaul of Surface Ships (GSO) 2.13 MIL-STD-2191, Repair, Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting
2.14 S9CG0-BP-SRM-010/CG-47CL, Inspection, Testing, Fabrication, and Welding for Aluminum Superstructures During Repair, Alteration, and Modernization, for CG-47 Class Ships
2.15 TO300-AU-SPN-010, Fabrication, Welding and Inspection of Small Boats and Craft, Aluminum Hulls
2.16 S9086-RK-STM-010/CH-505, Piping Systems
ITEM NO: 009-012
FY-27
2.17 S9LCS-BF-SRM-010/LCS-2, Inspection, Testing, Fabrication, and Welding for Structural Repair, Alteration, and Modernization, for LCS-2 Variant Ships 2.18 S9LCS-BG-SRM-010/LCS-1 CL, Inspection, Testing, Fabrication, and Welding for Structural Repair, Alteration, and Modernization, for LCS-1 Variant Ships 3.
REQUIREMENTS:
3.1 Utilize specific requirements of 2.1 through 2.11 and 2.15 listed in Tables One, 2, 3, and 4 of this item for determining the welder and brazer qualifications, electrodes, weld design, welding requirements, brazing requirements, welding procedures, brazing procedures, welding parameters and controls, inspection standards, and acceptance criteria. 3.1.1
Maintain a Welding Workmanship Program and a Welding Surveillance Inspection Program if conducting structural and fabrication work in accordance with 2.1. 3.1.2
Maintain a Welding Training Program in accordance with 2.4.
3.1.3
Maintain a Brazing Process Inspection in accordance with 2.5.
The beginning of the document. Download the full file to read on.