JA CapacityIncrease Energy AE IDIQ CCP Redacted
Updated
A PDF document (1.1 MB) attached to J&A for Capacity Increase to Architect-Engineer Services and the Design of Energy Efficiency Utility and Energy Consuming System Projects at Shore Facilities in Various Locations Worldwide, from the Department of the Navy.
File name: JA_CapacityIncrease_Energy_AE_IDIQ_CCP_24JUL2026_Redacted.pdf
The full file is for paid members, or buy this bid alone.
Preview
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING AND EXPEDITIONARY WARFARE CENTER
1000 23RD AVENUE
PORT HUENEME CA 93043-4301
IN REPLY REFER TO:
4200
JA-26-0013
24 July 2026
JUSTIFICATION AND APPROVAL
FOR USE OF OTHER THAN FULL AND OPEN COMPETITION
1. Contracting Activity
The contracting activity is Naval Facilities Engineering and Expeditionary Warfare Center (NAVFAC EXWC), Utilities and Energy Engineering (UEE), Contracting Department 77 (CON77), Naval Base Ventura County (NBVC), Port Hueneme, California.
2. Description of Action Being Approved:
This Justification and Approval (J&A) authorizes and approves the use of other than full and open competition to increase the contract capacity by
, from
to
for Contract N39430-23-D-4051, awarded to CH2M Hill / Clark Nexsen Joint Venture (JV).
3.
Description of Supplies/Services:
This Architect-Engineer (A-E) Service Indefinite Delivery Indefinite Quantity (IDIQ) contract has a base ordering period of 60 months from 18 September 2023 to 17 September 2028. The purpose of this contract vehicle is to provide A-E support for the NAVFAC EXWC, Energy security projects and services which include shore facilities and utility systems at various locations worldwide. These services require highly specialized expertise in installation and facility of energy, water, and utility systems, with supporting architectural, mechanical, electrical, civil, structural, and environmental disciplines as it pertains to Department of War (DoW) utility systems and energy consuming systems within the naval shore infrastructure. The primary type of funding historically used and anticipated to be used on future orders is Operations and Maintenance, Navy (O&M,N).
4.
Statutory Authority Permitting Other Than Full and Open Competition:
The statutory authority permitting other than full and open competition is 10 U.S.C. § 3204(a)(2), Unusual and compelling urgency.
5.
Rationale Justifying Use of Cited Statutory Authority:
Historically, NAVFAC EXWC averaged
per year for specialized A-E energy
services. However, due to rapidly evolving global threat environments and subsequent DoW/Navy mandates to close shore installation energy resilience gaps, specifically the issuance of the DON Installation Energy Resilience Strategy and the establishment of the SIOP program,
J&A No. JA-26-0013
document will be made publicly available on SAM.gov within 30 days after the award of the contract modification.
7.
Determination of Fair and Reasonable Cost:
The beginning of the document. Download the full file to read on.