JOTFOC
Updated
A PDF document (324 KB) attached to Valve Kit, from the US Coast Guard. Due Nov 12, 2026, 12:00 PM (UTC-5).
File name: JOTFOC 2127407B3000DZ005.pdf
The full file is for paid members, or buy this bid alone.
Preview
U.S. COAST GUARD JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
COMMERCIAL PRODUCTS AND SERVICES AT OR BELOW THE SAT
FAR 12.102(a), FAR Class Deviation 25-21 Rev. 1 for FAR Part 12
PURCHASE REQUEST OR REQUISITION NUMBER:
ESTIMATED TOTAL VALUE, INCLUDING OPTIONS:
(Over Micro-Purchase Threshold, but up to the SAT)
2127407B3000DZ005
AUTHORITY
Restricting Competition FAR
12.102(a), FAR Class Deviation 25-21
Rev. 1 for FAR Part 12
JUSTIFICATION TYPE
☐ Only One Source Is Available (e.g., urgency, exclusive licensing agreements, or industrial mobilization).
☒ Brand Name - Items peculiar to one manufacturer: The particular brand name, product, or feature is essential to the Government’s requirements, and market research indicates other companies’ similar products, or products lacking the particular feature, do not meet, or cannot be modified to meet, the agency’s needs
BRIEF DESCRIPTION OF SUPPLIES OR SERVICES REQUIRED AND THE INTENDED USE:
The purchase of Thirty (30) each VALVE ASSEMBLY, PART NUMBER KS355, NSN 4810-01-603-7348. 45’ RBM
SUGGESTED SOURCE NAME, ADDRESS, & UNIQUE ENTITY IDENTIFIER (UEI):
PALMER JOHNSON POWER SYSTEMS LLC
1835 HAYNES DR
SUN PRAIRIE, WI. 53590
UEI: WGJSG2GA5KV9
RATIONALE FOR JUSTIFICATION TYPE SELECTED ABOVE TO INCLUDE RELEVANT INFORMATION GAINED
THROUGH YOUR MARKET RESEARCH TO SUPPORT THE JUSTIFICATION TYPE:
The technical data for the VALVE ASSEMBLY required to make an accurate assessment of equal or alternate equipment meeting the Coast Guard’s performance, fit, form and function requirements for this procurement is unavailable. The VALVE ASSEMBLY is in support of the currently installed parts on the 45’ RBM. Any attempt to manufacture this item without the proper Original Equipment Manufacturer (OEM) parts and access to OEM reproduction manufacturing drawings, spec, tolerances/parameters, test procedures and other relevant information, could lead to major mission degradation.
CONTRACTING OFFICER - FAIR AND REASONABLE PRICE DETERMINATION METHODS:
☒
MARKET RESEARCH
☒
COMPARISON OF PROPOSED PRICE WITH PRICES FOUND REASONABLE ON PREVIOUS PURCHASES
☐
CURRENT PRICE LIST
☒
COMPARISON WITH SIMILAR ITEMS IN A RELATED INDUSTRY
☐
COMPARISON TO IGCE
☐
CONTRACTING OFFICER’S PERSONAL KNOWLEDGE (EXPLAIN)
☐
OTHER (EXPLAIN)
Last Updated 03/03/2026
SIGNATURE AND TITLE OF TECHNICAL AND REQUIREMENTS POC
HALL.CHRISTOPHER.A.1045651165
SIGNATURE OF CONTRACTING OFFICER
Last Updated 03/03/2026
DATE
Digitally signed by HALL.CHRISTOPHER.A.1045651165
Date: 2026.10.15 09:53:38 -04'00'
The beginning of the document. Download the full file to read on.