JOTFOC
Updated
A PDF document (337 KB) attached to Grating Nonmetallic, from the US Coast Guard. Due Nov 23, 2026, 12:00 AM (UTC-5).
File name: JOTFOC 2127407B3000DZ011.pdf
The full file is for paid members, or buy this bid alone.
Preview
U.S. COAST GUARD JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
COMMERCIAL PRODUCTS AND SERVICES AT OR BELOW THE SAT
FAR 12.102(a), FAR Class Deviation 25-21 Rev. 1 for FAR Part 12
PURCHASE REQUEST OR REQUISITION NUMBER:
ESTIMATED TOTAL VALUE, INCLUDING OPTIONS:
(Over Micro-Purchase Threshold, but up to the SAT)
2127407B3000DZ011
AUTHORITY
Restricting Competition FAR
12.102(a), FAR Class Deviation 25-21
Rev. 1 for FAR Part 12
JUSTIFICATION TYPE
☐ Only One Source Is Available (e.g., urgency, exclusive licensing agreements, or industrial mobilization).
☒ Brand Name - Items peculiar to one manufacturer: The particular brand name, product, or feature is essential to the Government’s requirements, and market research indicates other companies’ similar products, or products lacking the particular feature, do not meet, or cannot be modified to meet, the agency’s needs
BRIEF DESCRIPTION OF SUPPLIES OR SERVICES REQUIRED AND THE INTENDED USE:
The purchase of forty (40) each, Grating, Nonmetallic, P/N VEFRT3320, NSN 5680-01-644-7975 45’RBM.
SUGGESTED SOURCE NAME, ADDRESS, & UNIQUE ENTITY IDENTIFIER (UEI):
FIBERGRATE COMPOSITE STRUCTURES INC
5151 Beltline Rd
Ste 700
Dallas, TX 75254
UEI:
ZL47E1AHJZF3
RATIONALE FOR JUSTIFICATION TYPE SELECTED ABOVE TO INCLUDE RELEVANT INFORMATION GAINED
THROUGH YOUR MARKET RESEARCH TO SUPPORT THE JUSTIFICATION TYPE:
The technical data for the parts required to make an accurate assessment of equal or alternate equipment meeting the Coast Guard’s performance, fit, form and function requirements for this procurement is unavailable. The parts are in support of the currently installed parts on the 45’RBM. Any attempt to manufacture this item without the proper Original Equipment Manufacturer (OEM) parts and access to OEM reproduction manufacturing drawings, spec, tolerances/parameters, test procedures and other relevant information, could lead to major mission degradation.
CONTRACTING OFFICER - FAIR AND REASONABLE PRICE DETERMINATION METHODS:
☒
MARKET RESEARCH
☒
COMPARISON OF PROPOSED PRICE WITH PRICES FOUND REASONABLE ON PREVIOUS PURCHASES
☐
CURRENT PRICE LIST
☒
COMPARISON WITH SIMILAR ITEMS IN A RELATED INDUSTRY
☐
COMPARISON TO IGCE
☐
CONTRACTING OFFICER’S PERSONAL KNOWLEDGE (EXPLAIN)
☐
OTHER (EXPLAIN)
Last Updated 03/03/2026
SIGNATURE AND TITLE OF TECHNICAL AND REQUIREMENTS POC
DATE
SIGNATURE OF CONTRACTING OFFICER
DATE
signed by HALL.CHRISTOPHER.A.1045651165
HALL.CHRISTOPHER.A.1045651165 Digitally
Date: 2026.08.19 11:56:51 -04'00'
Last Updated 03/03/2026
The beginning of the document. Download the full file to read on.