PERFORMANCE WORK STATEMENT (PWS)

Version 2
November 2026

[PPIA JSCG-P RLB Site Development– Materials]
Part 1
General Information
1. General: This is a non-personal services contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. The United States (U.S.) Government shall not exercise any supervision or control over the Contractor’s employees performing the tasks herein. Such contract employees shall be accountable solely to the Contractor who, in turn shall be responsible to the U.S. Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the delivery of construction material at Panama Pacifico International Airport (PPIA) as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property (GFP) and government furnished services (GFS). The contractor shall perform to the standards in this contract.
1.2 Background: The project site is located at PPIA near the southeastern boundary of the airport. U.S. Army troops will conduct construction activities at one (1) designated work area identified in Technical Exhibit A. One (1) gravel pad will be built on approximately 17,000 m². Materials delivered under this contract will support construction activities performed by on-site personnel. This effort will enable U.S. forces to conduct required construction tasks at Panama Pacifico International Airport (PPIA). 1.3 Objectives: The objective of this requirement is the delivery of geotextile, gravel, and the performance of waste disposal in support of U.S. Army engineer operations at Panama Pacifico International Airport (PPIA). The objective of this project is to transport and deliver all gravel and drainage material needed to support the development of one (1) gravel pad location totaling 4.22 acres. The Contractor is responsible solely for the transportation and delivery of materials; all installation, placement, and construction activities will be performed by Government or designated- onsite personnel. 1.4 Scope: : The contractor shall provide services to transport and deliver aggregate materials and associated deliverables, including 4,400 loose cubic yards of ¾”–0 angular crushed stone mixed with