Justification and Approval Redacted
Updated
A PDF document (138 KB) attached to Switching Unit, Power, from the Defense Logistics Agency.
File name: 1.20 J&A_SPRMM1-26-C-MA14_Redacted.pdf
The full file is for paid members, or buy this bid alone.
Preview
Line of Accounting
97 00 XX XX 4930 NC1A 000 81004 0 050120 7R 000000 8PMH00000000
4. Statutory Authority Permitting Other Than Full & Open Competition This J&A is based upon the authority of 10 USC 3204(A) (1), only one or a limited number of responsible sources will satisfy agency requirements, as implemented by FAR 6.302-1
5. Rationale Justifying Use of Cited Authority
A/RMC
Acquire, for the second or subsequent time, directly from the actual manufacturer.
A/RMSC
R
The Government does not own the data or the rights to the data needed to purchase / contract repair of this part from additional sources. It has been determined to be uneconomical to buy the data or rights to the data. It is uneconomical to reverse engineer the part. This code is used when the Government did not initially purchase the data and/or rights. If only one source has the rights or data to manufacture/repair this item, A/RMCs 3, 4, or 5 are valid. If two or more sources have the rights or data to manufacture/repair this item, A/RMCs 1 or 2 are valid. This acquisition will be solicited to
L3HARRIS MARITIME POWER & ENERGY SOLUTIONS INC - (04801). Based on the market research performed by the technical advocate, it is concluded that the only source of procurement is L3HARRIS MARITIME POWER & ENERGY SOLUTIONS INC - (04801). L3 Harris is the OEM and is the only source that owns the rights to the data. It has been deemed uneconomical to pursue the acquisition of the data because the data and it's content are not available. There are no authorized substitutes known at this item as this is the only item known to meet performance and compatibility requirements within the higher assembly. Furthermore, there is no data to support an open and full competition.
6. Description of Efforts Made To Solicit Offers From as Many Offerors as Practicable 15 MAR 2019 Class Waiver of the Requirement to Post a Request for Information or Sources Sought Notice applies to this requirement
The proposed contract action was synopsized on the government-wide point of entry on
and as a result
05/29/2024
No other vendors provided a quote.
Market research was conducted in accordance with far part 10. The results of the market research conducted (or the reason(s) market research was not conducted) are as follows
A technical review, which consisted of searching several Government databases including ITIMP, FLIS and ERP, has been completed on this item. Search criteria included Part Number, Design Control Activity, Cage Code, NSN, Nomenclature, AMC/AMSC, AAC, Criticality Coding, recorded approved sourced of supply,
The beginning of the document. Download the full file to read on.