NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Glenn Research Center
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
(JOFOC)
For Aitech Single Board Computers
1. Federal Acquisition Regulation (FAR) 6.104-1(a)(1) – Identification of the agency and the contracting activity, and specific identification of the document as a “Justification for other than full and open competition.”
This document is a justification for other than full and open competition prepared by National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC). The procuring agency is NASA, and the contracting activity is GRC. 2. FAR 6.104-1(a)(2) – The nature and/or description of the action being approved: This justification provides the rationale for contracting by other than full and open competition to award a sole-source contract with Aitech Defense Systems for procurement of Service Pack 0 (SP0) space-qualified, radiation-tolerant single-board computers. 3. FAR 6.104-1(a)(3) – A description of the supplies or services required, to meet the Agency’s needs (including the estimated value):
NASA requires space-qualified, radiation-tolerant single-board SP0 computers to implement flight avionics and software for the Space Reactor-1 (SR-1) Freedom Nuclear Power Module (NPM). These SP0s are the on-board computers used for flight and within the testing labs. They are designed specifically for aerospace applications. SP0s currently reside within the existing ground test architecture at both GRC, within the avionics group, and JSC, within Software Test Labs. This existing hardware will be used to reduce risk in these areas prior to the delivery of new hardware from Aitech. The relevant potential hardware has been identified to fit the project needs. The schedule to meet these needs requires delivery of flight hardware by Fall-2027 (~12 months), to support system level testing near the end-2027. The estimated cost for the hardware is approximately $9.8 million combined to support flight hardware procurement and avionics ground testing. This includes three units that can be used for a combination of flight and qualification, test equipment to be sent to INL and JSC for integrated reactor testing and software testing.
Rev.:4/2026
4. FAR 6.104-1(a)(4) – An identification of the statutory authority permitting other than full and open competition:
The statutory authority permitting other than full and open competition is 10 U.S.C. 3204(a)1, as implemented by FAR 6.103-1 Only one responsible source and no other supplies or