Home / JOFOC - Peraton Annual Site License/Maintenance / Document

Justification for Other Than Full and Open Competition - ARTEMIS Peraton Maintenance Redacted

Updated

A PDF document (260 KB) attached to JOFOC - Peraton Annual Site License/Maintenance, from the National Aeronautics and Space Administration.

File name: JOFOC - ARTEMIS Peraton Maintenance - Final_Redacted.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

IT PROCUREMENT OFFICE (ITPO)

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

(JOFOC)

UNUSUAL AND COMPELLING URGENCY

FOR PERATON ANNUAL SITE LICENSE/MAINTENANCE

1. Federal Acquisition Regulation (FAR) 6.104-1(a)(1) – Identification of the agency and the contracting activity, and specific identification of the document as a “Justification for other than full and open competition.”
This document is a justification for other than full and open competition prepared by National Aeronautics and Space Administration (NASA).
The procuring agency is NASA, and the contracting activity is Information Technology Office (ITPO).
2. FAR 6.104-1(a)(2) – The nature and/or description of the action being approved: This justification provides the rationale for contracting by other than full and open competition to award a sole source order to Peraton.
The purpose of this order is to secure the annual licensing and maintenance support necessary for the Artemis program to continue utilizing Peraton software in support of Artemis launch operations. This requirement is critical to NASA’s Artemis campaign and its overall mission to safely land humans on the lunar surface.
The Artemis campaign’s timeline, and its included mission dates, are a vital component of the government’s need. For reasons discussed below, delays to mission execution as a result of developmental challenges are likely to result in mission failure. This Peraton Annual Site License/Maintenance order is necessary to ensure that development of a lunar landing capability is complete in time to support NASA’s Artemis missions. a. The Artemis Campaign and National Strategic Interests. The Artemis campaign consists of several interconnected NASA programs, encompassing multiple contracts and international efforts. Each component of the campaign is required to reach the agency’s end state of landing humans on the lunar surface. Among these programs are: the Space Launch System (SLS), NASA’s primary space launch capability; Orion, NASA’s solution for transport of crew from low-earth orbit to cis-lunar orbit; ExtraVehicular Activity (EVA) suits and the Human Landing System (HLS). Each of these programs depends upon the timely development and success of the others to perform its role, and delays within one program have a cascading effect upon the others.

09/2026

NASA’s Artemis campaign explores the Moon for scientific discovery, technology advancement, and to learn how to live and work on another world in order prepare for human

The beginning of the document. Download the full file to read on.